Posted Jan 24, 2022, 1:01 AM
|
Registered User
|
|
Join Date: Dec 2018
Location: Chicago
Posts: 1,107
|
|
Quote:
Originally Posted by ardecila
The 2 buildings along the river north of Concord Place are not part of this next phase. I'd be surprised to see them completed by 2026. The bridge too, they're talking about 2030 for that.
|
Page 12 of the presentation says 2025 for the bridge. Is this the same bridge? https://www.chicago.gov/content/dam/...R6_reduced.pdf
|