Originally Posted by k1052
The cost of the new North Avenue bridge is estimated at 20ish million. Assuming it overruns (like almost all projects do) say 25-30 million to replace the rail bridge. That also assumes approval can be secured to remove the existing structure.
Edit: Yes no lifting required anymore. The bridge at Grand is now bolted together and I think they only managed it to lift for the inspection by praying to Allah, God, Jesus, Buddha, Shiva, and sacrificing a small goat.
|
I heard $21mil for construction only....I would assume design/engineering/management was on the on the order of $5-10million. The Kinzie site is much smaller with less room for staging. I think $40 mil is a reasonable estimate.