View Single Post
  #1  
Old Posted Jun 26, 2007, 3:07 PM
Minato Ku's Avatar
Minato Ku Minato Ku is offline
Tokyo and Paris fan
 
Join Date: Jul 2006
Location: Paris, Montrouge
Posts: 4,168
Paris Transit Thread

Metro

U/C


Mairie de Montrouge to Bagneux (2020): 1.9 km, 2 stations


Front Populaire to Maire d'Aubervilliers (2019): 2 stations


Saint Lazare to Mairie de Saint Ouen (2019): 5.5km, 4 stations

Preparatory work


Mairie des Lilas to Rosny-Bois-Perrier (2022): 5.4 km, 6 stations


Noisy - Champs to Pont de Sèvres (2022): 33 km, 20 stations

RER

U/C


New station: Rosa Park (end of 2015)

Preparatory work


Haussmann Saint-Lazare to Nanterre-La Folie (2020): 8 km 3 stations
Extension from Nanterre-La Folie to Mantes-la-Jolie (2022) using refurbished existing infrastructure (2022): 45 km 10 station

Last edited by Minato Ku; Jul 9, 2015 at 8:13 PM.
Reply With Quote