I think the berm where 19th will head down into Crane Cove Park has gotten some additional greenery
for much of the length of the park, the sidewalk will be inside the wrought-iron fence that lines Illinois (barely seen on the left in the pic). south of 19th St it appears there will be a stretch with no sidewalk, above the parking lot, before it picks up again in front of Restoration Hardware
the north end of CC Park again, with the intriguing metal thing on the left
the sidewalk in front of 2177 Third has been poured, so getting closer to the finish line there
work on the south bank of the Creek
what I think is the last gap in the trackway for the T-Third extension, across King. all the complicated bits have been laid, where the tracks cross over eachother. it's just the final connection to the tracks to the north that's left
to these:
the
work on Townsend looks just about wrapped up
looking west from near Fourth
one awkward thing is that many of the utility poles now sit in the bike lane