View Single Post
  #308  
Old Posted Aug 5, 2016, 10:53 PM
Chilliut23 Chilliut23 is offline
Registered User
 
Join Date: Aug 2015
Posts: 6
Quote:
Originally Posted by harryc View Post
The bright orange beams are temporary the two 90' beams on either side are permanent parts of the building. The City Safety Inspector told me of the plans to move the stand, and confirmed it will stay raw steel - no concrete/rebar like on 111 W Wacker.

WJ's photos

Welcome to the forum !
That's an ironworker sitting on the block. I don't think with of our operators on this job could make it out there haha.