Long-stalled “rat castle” at 179 Ludlow resumes work
Project to hold ground-floor retail, six stories of floor-through apartments
Quote:
Work has finally resumed at the long-stalled 179 Ludlow, which has sat half-finished since 2006.
Fresh work on the building’s balconies are the first hint that the site is moving forward, as Bowery Boogie reported. Department of Buildings permits posted on the site show that the property will ultimately have 1,650-square-feet of commercial space on the ground floor, along with six upper stories of floor-through apartments. Kleinmann Group is listed as the architect of record.
|
==================================
April 29, 2014
http://therealdeal.com/blog/2014/04/...-resumes-work/