View Single Post
  #1095  
Old Posted Jan 7, 2021, 1:26 PM
Ned.B Ned.B is offline
Registered User
 
Join Date: Nov 2013
Posts: 608
Based on the construction cam from yesterday, it appears that the core has now reached the top of the mid rise elevator bank (floor 35), is about to be reduced down to 2 cells for the remaining core, and is now 1 or 2 floors above where the 2nd setback will be.