Brief Mission Bay update:

The steel on 409 Illinois is topped out and concrete crews are pouring the fourth floor slab yesterday and today. The crane has moved over and started the steel for 499 Illinois as of yesterday.

Piledrivers on Radiance Phase II and Alexandria's Block 26 have been pretty quiet. Radiance may be done...not sure where we stand with Block 26, although I saw them driving one pile yesterday. All three piledrivers remain on-site.

Not much new visible on from the outside on the Lowe building, which was just purchased by CB Richard Ellis.

555 Mission Rock work continues, with forms for the second floor being put in place, so we're starting to something more than just a few columns and sheer walls sticking up from the ground.

On the western side next to 280, some groundwork is still going on where the parking garage is supposed to be. Not sure what the timetable is. Work still continues slowly on 1500 Owens...not coming out of the ground. Crews are working hard on laying the infrastructure in this area for extending Owens Street. Wicks have been completed for the roundabout and the connections under 280. Soil is being loaded on for surcharging.

Bosa and their sub-contractors have set up a village of trailers just south of the channel. Construction should start soon on their projects in that area.

And piledriving continues north of the channel on 335 Berry.