View Single Post
  #15851  
Old Posted Mar 23, 2023, 5:53 PM
unpermitted_variance unpermitted_variance is offline
Registered User
 
Join Date: Mar 2021
Location: Oakland
Posts: 114
Quote:
Originally Posted by Streamliner View Post
The Ridge Walk North project has site plans and building cross sections in their CEQA documents:

https://plandesignbuild.ucsd.edu/pla...Impact-Reports

Ridge Walk is Addendum number 12 here. Site plans start on page 17 of the pdf. Addendum 11 is the Triton Center. I think that awesome EYRC rendering is from an earlier iteration. It would have been amazing though.
Great find Streamliner!

Here's some additional renderings and a site plan from the EIR addendum for Ridge Walk North:








Due to their height, location, and topography, these likely won't be nearly as visible as the other recent and ongoing tower projects at UCSD.

What's unclear in the plans is what's going to happen with the sites on the west side of Ridgewalk, currently home to the Marshall admin building and Sequoyah hall. They're set to be demolished, but the site plan is unclear on what the future use will be (aside from the location for the construction trailers).
Reply With Quote