View Single Post
  #1242  
Old Posted Dec 30, 2022, 1:31 AM
IndyAZ IndyAZ is offline
Registered User
 
Join Date: Mar 2020
Posts: 274
Quote:
Originally Posted by xymox View Post
Looked like the Optima Kierland crane came down recently. Also looks like crane pieces are gathering on the Optima McDowell Mtn site. That won’t break ground until summer - why would they put crane pieces on site already? Free storage?
Drove by the site today, the crane parts are gone along with the temporary fence that has been on site for about the past 2 years, which is probably a good sign. I am wondering if they push to get a at-risk grading permit to start digging the basement, since a 2-story underground garage of that size will take a long time to dig, even if they don't plan on having a building permit till Summer.
Reply With Quote