View Single Post
  #23  
Old Posted Aug 4, 2023, 12:31 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,859
Murray Nears Completion At 509 Third Avenue In Murray Hill, Manhattan



Quote:
Construction is finishing up on Murray, a 35-story residential tower at 509 Third Avenue in Murray Hill, Manhattan. Designed by Ismael Leyva Architects and developed by Kahen Properties with Lalezarian Properties under the Third and Thirty Four LLC, the 386-foot-tall structure will span 166,917 square feet and yield 229 rental units with an average scope of 692 square feet, as well as 8,253 square feet of retail space on the ground floor and a private 30-foot-long yard. Charlton Development Group is the general contractor for the project, which is located at the corner of Third Avenue and East 34th Street.

Façade installation was still progressing on the wide southern elevation and slim western profile facing Third Avenue and East 34th Street at the time of our last update in the beginning of the year. Since then, most of the scaffolding and construction netting has been dismantled, revealing the completed look of the exterior, which is composed of floor-to-ceiling glass framed with light gray paneling. Work is still finishing up on the ground floor, but should conclude in the coming weeks.

509 Third Avenue has an anticipated completion date of fall 2023, as noted on the construction board.
=================
NYY
Reply With Quote