Posted Jan 4, 2021, 5:03 AM
|
|
Registered User
|
|
Join Date: Aug 2007
Location: Chi-River North
Posts: 421
|
|
Some seem to think site I is going to break ground as soon as construction wraps up on Cirrus and Cascade just b/c the developer said site I was the next tower to start after those two are completed. The developer simply meant site I was the next tower to break ground but not necessarily right after. Also, I believe site I is supposed to host 600 condos after the hotel portion was removed. Minus COVID, we would have been lucky to have site I break ground late 2021. I highly doubt that'll happen now. Maybe sometime in 2022. Hope I'm wrong though.
|