^ Thanks for posting that. I saw it come across my feed a while ago and was meaning to get around to putting it up on here. I have added it to the rundown. It doesn't look like too terrible a loss to lose the entire block of existing structures (the
Ross Building being the exception).
Mishawaka -
City Hall update:
(from the Architect's LinkedIn post)
"Framing at the ground floor is almost complete, the suspension ceiling is starting to be installed , copper metal panels are being installed and site grading is continuing."
Source:
LinkedIn | Alliance Architects