View Single Post
  #3366  
Old Posted Jun 14, 2022, 1:32 PM
gsmith318 gsmith318 is offline
Registered User
 
Join Date: Sep 2014
Location: Chicago
Posts: 6
Quote:
Originally Posted by takascar View Post
Was flying in and out of Ohare two weeks ago and noticed a bunch of digging and construction work on the tarmac out by the C concourse.

Is this perhaps the beginning of the tunnel for the second mid-field terminal extension? It doesn't really look like the right location.

They were breaking up the concrete on the tarmac and had about 12 different pieces of equipment.
That would be the "Taxiway K/L Grade Separation" project listed here:
https://www.tpapord.com/projects/

They are still working on approvals for the global terminal and remote gates. Draft Environmental Assessment just came out. This needs to be approved before they can start any of the remaining major announced projects::
https://www.faa.gov/airports/great_lakes/TAPandATEA/
Reply With Quote