Quote:
Originally Posted by Klippenstein
If this is the rail line that I think it is, they need to do that all the way down the line. As novel as it is to wait for the train on the way to Midway, this is a great step and definitely needs to happen at 55th, 63rd and all the other crossings.
|
CREATE has prioritized the line running west from 55th Junction for grade separations. They have planned an underpass at Central/54th and an overpass at 65th/Harlem.
The crossings at 55th/Kenton, 63rd/Kolmar and Marquette/Kolmar are not being pursued at this time, since they don't have the same (auto/truck) traffic volumes.