View Single Post
  #179  
Old Posted Jun 5, 2022, 8:19 AM
worldtrade2021 worldtrade2021 is offline
Registered User
 
Join Date: Oct 2021
Posts: 240
While not officially announced yet, the first paneling of black granite or the last paneling before the installation of the black granite on the base of the PAC might be starting now, and appears visible on a portion of the south facing base of the PAC on these two cams: https://archives2.earthcam.com/archi...hive4/live.jpg, https://archives2.earthcam.com/archi...hive5/live.jpg
The inside of the ADA accessible entrance also no longer shows exposed concrete.

Here are some pictures showing how the top portion of the PAC is already looking well on its way to completion.

Pictured: Oculus, One WTC, and top of PAC in one view, framed to the left by the north ribs of the Oculus, taken in June 2022
Credit: @lucolparis
https://www.instagram.com/p/CeXB7I5jcBc/

Pictured: Night lights at the top of the PAC, taken in April 2022
Credit: @agencyim
https://www.instagram.com/p/Cc3dlJDO1_N/

Pictured in first image: Marble west facade catching the sunlight with 7 WTC in the background, taken in November 2021
Credit: @agencyim
https://www.instagram.com/p/CV2iCDVryi_/

According to this link, the PAC might be scheduled to open as soon as early 2023:
https://downtownny.com/news/whats-ne...-2022-updates/

As with other PAC buildings, it appears from the renderings of the finished building that the stairway entrance will be protected from the outside elements with a glass wall.

Last edited by worldtrade2021; Jun 14, 2022 at 5:39 PM.
Reply With Quote