View Single Post
  #11  
Old Posted Jun 15, 2021, 8:32 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
KLIA Aeropolis Masterplan
Quote:
1998-2021
KLIA
- Runway 1-2
- Main Terminal/Satellite 1
- KL Air Traffic Control Centre
- Sama Sama Hotel

KLIA2
- Runway 3
- AirAsia HQ (REDQ)
- Tune Hotel KLIA2

Sepang International Circuit
- MotoGP

Business Park
- Mitsui Outlet Park KLIA
- Movenpick Hotel/Convention Centre KLIA
- Malaysia Airport Holdings Berhad (MAHB) HQ
- KLIA Police HQ
- Tabung Haji Complex
- Sultan Abdul Samad Mosque

Aeronautical Support Zone 1
- Airbus MRO (Sepang Aircraft Engineering)
- AirAsia Engineering Complex
- Alibaba Cainiao
- CAE Kuala Lumpur
- Malaysia Airlines Berhad (MAB) HQ/Engineering Complex
- MAHB Engineering Complex
- Tune Hotel KLIA Aeropolis
Quote:
Masterplan
- KLIA Satellite 2
- Runway 4
- Airport Central
- Aerospace Park
- Logistics Park
- Aeronautical Support Zone 2

Last edited by nazrey; Jun 15, 2021 at 9:18 AM.
Reply With Quote