Quote:
Originally Posted by ardecila
Unfortunately I think only single track (so two girders). It doesn't even look like the abutments are wide enough for a second track in the future.
|
Yes that northern track will be needed if the West Loop Transit is ever built so Intercity train can sweep right into Metra/Amtrak yards and then down the tunnel to the west side of CUS under Canal.