View Single Post
  #1522  
Old Posted Dec 30, 2013, 7:21 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
not too much new to report from a holiday week...

they have indeed started in on the pavers on MB Blvd North:



curb going in in front of the hospital:



the alleyway between blocks 2 and 3 was open (to pedestrians at least) for the first time, and it seemed this might be because a couple of the units have already been occupied in block 2 (not sure; this is based on: I saw someone that didn't look like a construction person go into the building, and thought I saw movement and furnishings/lights on in another section). this surprises me, since, altho there was a flurry of activity around the site and some of the interiors of common spaces look almost ready for occupancy, there also remains plenty of work to be done. anyway, here is the north side of block 3 along the alley:



and here in relation to block 2:



a random shot of the SE corner of Fourth and Channel:

Reply With Quote