View Single Post
  #137  
Old Posted May 25, 2017, 5:40 PM
Ned.B Ned.B is offline
Registered User
 
Join Date: Nov 2013
Posts: 609
I would like to point out that this was not a design competition, but rather a developer proposal, and each developer came to the table with their own architect. The elements shown in the renderings here are purely massing studies to determine a developer pro-forma, and the developer was selected based upon their offer price and their ability to work with the complex train operations going on below these 3 sites. The large portion of design has yet to be done, and everything shown here is subject to change. I can say with confidence that no more than a few weeks of design work has gone into what is presented here.