Thanks, BT. They seem to be done with testing piledriving, as the piledriver is silent, there are no more piles laying around on-site, and they've trimmed all of the driven piles down to ground level. Given them a little bit of time to start manufacturing the rest of piles at the appropriate lengths and we'll be on our way!

Equipment is rolling in for UCSF's temporary utility plant in that same area as well. Still lots of stuff dug up for laying the pipelines as well.

Noticed streetlights go up along the future northward extension of Owens Street yesterday, past the frame of 1500 Owens.

Not much else new going on here. There's apparently a big new sculpture installed outside 500 Terry Francois, but I haven't been by there to see it...should be on the eastern side tucked into the "L" of the building.