View Single Post
  #1009  
Old Posted Sep 21, 2013, 2:45 PM
skyfan's Avatar
skyfan skyfan is offline
Detroit Love
 
Join Date: Mar 2004
Location: Detroit
Posts: 594
LINK DETROIT CONSTRUCTION BEGINS




Quote:
On your mark, get set, go! Detroit's next big biking and walking project is about to rush past the starting line.

Construction on Link Detroit, a multi-modal enhancement plan put forth by the city to enhance and connect existing greenways projects is now underway. When completed in November 2014, it will create an accessible network of routes for cyclists and pedestrians between major destinations like Eastern Market, Hamtramck, the RiverWalk, downtown Detroit and Midtown.

...
To start with, Eastern Market will be getting a major upgrade. The street curbs on Russell Street will be lined up in a consistent manner, and the area will be spruced up with trees and greenery. In addition, new bike parking structures will be installed at the district's main parking lot and at the corner of Russell and Wilkins.

The market will also feature easy access to the Dequindre Cut, a below-street level biking and walking path built on an old railroad line in downtown Detroit, which will be extended as part of the project. Currently, it runs from Woodbridge Street near the Milliken State Park at the riverfront to Gratiot Avenue. The extension will take it a mile north to Mack Avenue. Three bridges spanning the Cut will also be repaired and another taken down.

Another connection will link Eastern Market with Detroit's Midtown neighborhood, home to cultural attractions like the Michigan Science Center and the Detroit Institute of Arts. A new phase of the 1.8 mile Midtown Loop greenway will allow cyclists and pedestrians easy access to the market along a route that stretches across Mack, Brush and Wilkins
http://wearemodeshift.org/link-detro...lets-celebrate
Reply With Quote