View Single Post
  #3159  
Old Posted Aug 1, 2018, 4:19 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
the gondola won't be working yet when the transit center opens. should be going in September.

Quote:
Peter Back, head of construction for Boston Properties, blamed the delay on a request by its tenant, Salesforce, to eliminate a grove of 20 redwood trees planned to surround the gondola’s base. That required a redesign along with a long list of city approvals.
Reply With Quote