Thread
:
SAN FRANCISCO | Mission Bay
View Single Post
#
2485
Posted
Jun 14, 2021, 9:48 AM
timbad
heavy user of walkability
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
been a while since it has come up, but they have been working on a somewhat significant piece of sewer infrastructure over by the Ramp (Terry Francois Blvd and Mariposa) for some time now. looking forward to that wrapping up soon hopefully
fencing around the intersection with the 19th St extension along the edge of Crane Cove Park has come down, so it is easier to access the park (on foot) from the south now
the roadway itself is still getting its final touches
Fourth St with the Weill Neurosciences building completed
the last portion to open was the street leading back to Third
block 6W has had all its fencing removed as well
so another piece of MB has been filled in, and means that the only construction going on in the MB core at the moment is UCSF's project in the far SE corner and block 9W, also fairly tucked out of sight. probably one of the calmest times in that respect in almost 20 years. (of course, the separation of Mission Rock from Mission Bay is arbitrary, and that is in full swing.)
anyway, nice to have sidewalks back!
the mews between this block and block 6E
timbad
View Public Profile
Find all posts by timbad