View Single Post
  #18  
Old Posted Apr 16, 2018, 12:27 AM
lilwayne lilwayne is offline
Registered User
 
Join Date: Mar 2012
Posts: 732
Quote:
Originally Posted by trueviking View Post
The CMHR was built at a cost of $3000 per square foot. These buildings will be closer to $200 per square foot. That's 15 times cheaper!

The renderings are completely ridiculous. A full glass hotel? Not only is that not possible in the building code, it could never work economically. Their hotel across the street is a 20 storey stucco box for goodness sake.

The SOPO renderings were much more realistic. And far nicer in my opinion.
https://www.youtube.com/watch?v=lKPUuUsutOQ

project looks amazing totally disagree with the comments truviking made when project was announced.
Reply With Quote