Project Rundown

Unless noted otherwise, all projects for each location are arranged first by status, then by cost, if known (most to least expensive).

Status Order:
  • under-construction (listed first)
  • approved / proposed (listed second)
  • completed (listed third, newest to oldest)
  • demolished / destroyed (listed fourth)
  • cancelled (listed last)

Muskegon

Code:
Adelaide Pointe, Phase 1 under construction ($250 million)
(1204 and 1148 W. Western Ave.)

Source: Adelaide Pointe

Former Shaw Walker Factory Repurposing, multi-phase; ongoing (~ $40+ million?)
(general location)

Source: The Frederick News-Post

Terrace Point Landing, ongoing construction (~ $20 million?)
(general location)

Source: Terrace Point Landing

Muskegon Infill Housing (~ 240 homes), under construction (~ $18 million?)
(locations vary - pictured location)

Source: MLive

Hartshorn Village, multi-phase condos, under construction (~ $14 million?)
(general location)

Source: Facebook | Hartshorn Village and Marina

Muskegon Museum of Art Expansion, under construction ($11.2 million)
296 W Webster Ave.

Source: Mathison | Mathison Architects

The Leonard, under construction ($8.9 million)
292 W. Western Ave.

Source: Facebook | The Leonard

Ten21 Apartments, under construction (~ $6 million?)
1021 Jefferson St.

Source: MLive | Courtesy Hooker DeJong

Muskegon Food Hall, under construction (~ $5 million?)
221 W. Webster Ave.

Source: Corey Morse | MLive

Muskegon Central 9-1-1 Dispatch addition, under construction (~ $1.5 million?)
770 Terrace St.

Source: LinkedIn | Construction Simplified

Pigeon Hill Entertainment Complex, under construction ($650,000)
441 W. Western Ave.

Source: MLive | Lynn Moore

Windward Point Mixed-Use Development, proposed ($400 million)
(general location)

Source: MLive | Courtesy DPZ CoDesign

Muskegon (Fruitport Township) Casino, proposed ($180 million)
(general location)

Source: WKSO | Courtesy Little River Band of Ottawa Indians / US Bureau of Indian Affairs

Harbor 31 mixed-use development, approved ($110 million)
(general location)

Source: Mlive | Courtesy Henrickson Architecture

Foundry Square mixed-use, proposed ($65 million)
(general location)

Source: Great Lakes Development Group

Microtel, proposed, part of Foundry Square (~ $2.5 million?)
(general location)

Source: Great Lakes Development Group

(Muskegon Township) Settlers Glen, proposed ($40 million)
(general location)

Source: MLive | provided by Craig Fritsma

Downtown Mixed-Use Development, proposed ($25 million)
West Western Ave. between Third and Fourth sts.

Source: MLive | Integrated Architecture

Lake View Lofts, Phase 2, proposed (~ $20 million?)
351 W Western Ave.

Source: Crain's Detroit

The Docks housing development, proposed (~ $20 million?)
(general location)

Source: The Docks Muskegon

Former Nelson Elementary School repurposing, proposed (~ $20+ million?)
550 W Grand Ave.

Source: LinkedIn | Cornerstone Architects, Inc.

Fields Cannary Cannabis Facility, proposed ($10 million)
420 S. Harvey St.

Source: MiBiz | Courtesy Photo

Samaritas Senior Housing, proposed ($10 million)
4 W. Webster Ave.

Source: MLive | Courtesy Samaritas

Former Peoples State Bank / Liberty Bank / Ameribank Building Repurposing,
Proposed (~ $35 million?)
880 First St.

Source: Crain's Detroit

The gutted structure as seen in August 2018

Source: MLive

Food Forward Farm - Business Incubator, proposed (~ $7 million)
713 Yuba St. (former Farmers Market)

Source: MLive | Courtesy Rendering

The Shoppes on Sherman, proposed ($5 million)
(Muskegon Heights - general location)

Source: MLive | Courtesy City of Muskegon Heights

Terrace Point Dry Marina and Townhomes, proposed (~ $5 million?)
(general location)

Source: MLive | Courtesy City of Muskegon

1095 Third St., proposed (~ $2+ million?)
1095 Third St.

Source: MLive

Chart House Energy Old Foundry Repurposing, proposed (~ $2+ million?)
825 W. Western Ave.

Source: MLive | Cory Morse

Former MCC Lakeshore Fitness Center redevelopment, proposed (~ $1.5 million?)
900 W Western Ave.

Source: MLive

Harbor Theater mixed-use conversion, proposed ($1.1 million)
1937 Lakeshore Dr.

Source: MLive

VanDyk Convention Center, completed April 2021 ($21 million)
460 W Western Ave.

Source: MLive | Hope Davison

Catholic Charities West Michigan Campus, completed March 2021 ($4.5 million)
(general location)

Source: MLive | Courtesy Catholic Charities West Michigan

Ryerson Creek Outfall EPA Restoration, completed December 2020 ($6.6 million)
(general location)

Source: greatlakesmud.org

1208 8th Street rehabilitation, completed late 2020 ($550,000)
1208 8th St.

Source: Core Realty Partners

Midtown Square infill homes, completed 2020 ($3 million)
(general location)

Source: WZZM 13

Northtown 794, completed June 2020 ($3 million)
794 Pine St.

Source: MLive

Western Place Condominiums, completed Spring 2020 (~ $3 million?)
243 W Western Ave.

Source: My own photo - February 2021

3rd St. / Midtown Streetscape Improvements, completed November 2019 ($900,000)
(general location)

Source: MLive

Mercy Health (former L.C. Walker) Arena renovations, completed 2019 ($3.5 million)
470 W Western Ave.

Source: MiBiz | Courtesy Rendering

Delta Hotels by Marriott (reno & rebranding), completed October 2019 ($6 million)
939 Third St.

Source: Marriott

MCC Arts & Humanities Renovation, completed August 2019 ($9 million)
(general location)

Source: Progressive AE

Lake View Lofts, Phase 1, completed July 2019 ($16 million)
351 W Western Ave.

Source: My own photo - February 2021

Nipote's Italian Kitchen (shipping containers), completed July 2019 (~ $150,000?
98 W Clay Ave.

Source: MLive | Kayla Renie

Industrial Warehouse, 490,000 SF, completed Summer 2019 (~ $6 million?)
2420 Remembrance Dr.

Source: loopnet

Pigeon Hill Production Facility, completed April 2019 ($25 million)
895 Fourth St.

Source: Muskegon Times

Mercy Health New Patient Tower, completed Spring 2019 ($271 million)
1500 E Sherman Blvd.

Source: Building Design + Construction

Heritage Square Townhomes / Condos / Commons, completed Spring 2019 (~ $15 million?)
(general location)

Source: MLive

MCC Health & Wellness Center, completed November 2018 ($14.2 million)
(general location)

Source: Clark Construction Company

Highpoint Flats Apartments (redeveloped highrise), completed May 2018 ($9 million)
285 W Western Ave.

Source: My own photo - February 2021

Rad Dad's Taco & Tequila Bar, completed May 2018 (~ $1 million?)
470 W Western Ave. Suite A

Source: Muskegon Times

Terrace Flats Apartment Conversion, completed Spring 2018 (~ $3 million?)
316 Morris Ave.

Source: apartmentfinder.com

Berkshire Muskegon (Senior Housing), completed April 2018 ($16 million)
929 First St.

Source: My own photo - February 2021

MCC Sturrus Technology Center, completed January 2018 ($15 million)
388 W Clay Ave.

Source: Rapid Growth Media | Courtesy MCC

Mercy Health Urgent Care North, completed December 2018 ($12 million)
2006 Holton Rd.

Source: Mercy Health

Planet 3 Extreme Air Park, completed May 2018 (~ $1 million +?)
1740 E Sherman Blvd. (former Target Store)

Source: MLive

Western Market Pop-Up Shops, completed May 2017, expanded May 2018 (~ $100,000)
(general location)

Source: Muskegon Western Market

Spectrum Health Integrated Care Campus North, completed December 2016 ($13.8 million)
2009 Holton Rd.

Source: Spectrum Health

MCC Science Center, completed August 2015 ($9.6 million)
(general location)

Source: MCC

B.C. Cobb Coal Power Plant Demolition, completed February 2020 (~ $2 million?)
(general location)

Source: MLive

(Dalton Township) Sensi Park Grow Facility, 2019 proposal - cancelled (~ $5 million?)
(general location)

Source: MiBiz | Courtesy Rendering

Sappi Paper Mill Demolition, completed Fall 2017 (~ $2 million?)
(general location)

Source: Holland Sentinel

Chase Hackley Piano Factory Demolition, completed Fall 2017 (~ $150,000?)
(general location)

Source: change.org
Holland

Code:
Hudsonville Ice Cream Expansion, under construction ($51 million)
345 E. 48th St.

Source: American Structurepoint Inc.

Towers on River, under construction ($26.9 million)
159 S River Ave.

Source: City of Holland

Perrigo 357,000 SF Distribution Center Warehouse, under construction ($13.6 million)
13295 Reflections Dr.

Source: Holland Sentinel | Contributed

The River Place by Resthaven, under construction (~ $4.5 million?)
210 / 212 S River Ave.

Source: Resthaven

The Commons at Westshore mixed-use development, proposed (~ $40+ million?)
Holland Charter Township - general location)

Source: Holland Sentinel | Courtesy Shops at Westshore

VisionQuest Companies HQ, proposed ($30 million)
(general location)

Source: Opera News / GRBJ

HOM Flats at 24th and Waverly, proposed (~ $16+ million?)
(general location)

Source: Holland Sentinel | City of Holland

HOM Flats at Felch Street, proposed (~ $12+ million?)
(Holland Charter Township - general location)

Source: Ionia Sentinel-Standard | Courtesy Magnus Capital Partners

W 36th St. Affordable Housing Development, proposed (~ $4 million?)
(general location)

Source: City of Holland

New Holland Brewing Expansion, proposed (~ $500,000?)
206 College Ave.

Source: City of Holland

GRCC Lakeshore Campus, completed August 2021 ($12 million)
(Holland Charter Township - general location)

Source: GRCC

Haworth Hotel, completed June 2021 ($7.5 million)
225 College Ave.

Source: Tripadvisor

Port 393 (event venue), completed June 2020 (~ $1.5 million?)
393 Cleveland Ave.

Source: Port 393

SpringHill Suites Holland (Township), completed April 2020 (~ $16 million)
3084 W. Shore Dr.

Source: Holland Sentinel

Staybridge Suites Holland (Township), completed November 2019 (~ $16 million?)
12170 James St.

Source: Facebook

@Home Realty, completed October 2019 ($6 million)
171 College Ave.

Source: T2 Construction Management

Holland Oz Project, completed July 2019 ($300,000)
Centennial Park

Source: Cory Morse | MLive

West 8th Mixed-Use Development, completed Spring / Summer 2019 (~ $35 million?)
Move theater, HopCat, commercial, apartments, parking deck (6 images, below)
(general location)

West 8th - Site Plan

Source: MLive

West 8th - Partial Rendering

Source: Wood TV 8

West 8th - Sperry's Moviehouse

Source: Holland Sentinel

West 8th - HopCat

Source: Twitter | @HopCatbr

West 8th - Lofts at West 8th

Source: Lofts at West 8th

50 West Residences

Source: realtor.com

Home2 Suites Holland (Township), completed January 2019 (~ $14 million?
3140 W Shore Dr.

Source: Hilton

George & Lucile Heeringa Civic Center Place, completed September 2018 ($16.5 million)
150 W 8th St.

Source: City of Holland

Western Theological Seminary Expansion, completed Fall 2018 ($15 million)
101 E 13th St.

Source: Western Theological Seminary

DeBoer Bakkeri - New / 2nd Location, completed April 2018 (~ $500,000?)
360 Douglas Ave.

Source: Austin Metz | Holland Sentinel

Holland Energy Park, completed October 1017 ($240 million)
1 Energy Park Way

Source: Progressive AE

Courtyard Marriott Downtown, completed February 2016 (~ $18 million?)
121 E 8th St.

Source: Facebook | Courtyard Marriott Downtown

Hope College Jack H. Miller Center for Musical Arts, completed Fall 2015 ($35 million)
221 Columbia Ave.

Source: Hope College
Norton Shores

Code:
Eastowne Centre, proposed (~ $30+ million?)
(general location)

Source: The Lakeshore | SVB - Reckley Architects

Dune Harbor Park, proposed (~ $20 million?)
(general location)

Source: MLive | Marge Beaver / Photography Plus

Mercy Health mixed-use facility, completed February 2021 ($20 million)
3570 Henry St.

Source: My own photo

















...
Coldwater

Code:
Branch County Jail & Sheriff's Office, completed October 2021 ($22 million)
580 Marshall Rd.

Source: LinkedIn | Byce & Associates, Inc.

(Ovid Twp.) Lakeland Elementary School, completed December 2020 ($20 million)
519 Otis Rd.

Source: LinkedIn | Jason Keen

The Lofts at Milnes Plaza, completed November 2020 (~ $4 million?)
20 N Hanchett St.

Source: Spire Development

Sekisui Voltek, LLC Expansion, completed Fall 2020 (~ $1.5 million?)
17 Allen Ave.

Source: LinkedIn | Byce & Associates, Inc. | Casey Spring Photography
Ionia

(reserved)

Niles

Code:
Post Office Apartments, completed early 2021 ($16 million)
322 E Main St.

Source: apartments.com

Niles Community Health Center, completed November 2019 ($8.5 million)
1951 Oak St.

Source: Frederick Construction

Four Flags Plaza Apartments remodel, completed 2019 ($13 million)
17 N 7th St.

Source: rentable.com

The Berkshire Niles, completed Spring 2019 ($12 million)
10 N. 3rd St.

Source: Berkshire Senior Communities




...
Grand Haven

Code:
Robinson Landing, under construction ($7.5 million)
(general location)

Source: MCC

The Trib, approved (~ $5 million?)
101 N. Third St.

Source: MLive | City of Grand Haven

GHBLP - New Operations and Technology Center, proposed ($43 million)
(general location)

Source: The Lakeshore | Courtesy Rendering

GHBLP - Former Power Plant repurposing, proposed
518 Harbor Dr.

Source: Google Maps

Peerless Flats (Mixed-Use Development), completed July 2023 ($24.7 million)
(general location)

Source: Second Wave Media | Courtesy Rendering

South Harbor Drive Rejuvenation, completed Fall 2020 (~ $3 million?)
(general location)

Source: LinkedIn | Abonmarche Consultants, Inc.

Fit Body Boot Camp (Starlite Lanes redevelopment), completed late 2019 (~ $2 million?)
1309 S Beacon Blvd.

Source: 

@Home Realty (Starlite Lanes redevelopment), completed late 2019 (~ $2 million?)
1307 S Beacon Blvd.

Source: @Home Realty

Noto's at the Bil-Mar, completed Fall 2018 (~ $1.2 million?)
1223 S Harbor Dr.

Source: MLive | Courtesy Noto's

Lynne Sherwood Waterfront Stadium, completed June 2018 ($4.5 million)
1 N Harbor Dr.

Source: MLive

J.B. Sims Generating Station Demolition, completed early 2020 ($5 million)
1231 N 3rd St.

Source: Wood TV 8
Sturgis

Code:
The Watershed, proposed (~ $4 million?)
(108-114 W Chicago Rd.)

Source: wthd.net

Monroe Lofts, proposed (~ $3 million?)
200 E Chicago Rd.

Source: Sturgis Journal | Courtesy Rendering

Radiant Life Church addition, completed 2020 ($3.3 million)
907 N Nottawa St.


Source: Miller Davis




















...

Big Rapids

Code:
Ferris State University Center for Virtual Learning, under construction ($29.5 million)
(general location)

Source: MLive | Courtesy FSU

(Big Rapids Township) Gotion EV Battery Plant, proposed ($2.36 billion)
(general location)

Source: Wood TV8 | Courtesy MEDC

Ferris State University Jim Crow Museum Expansion, proposed ($18.5 million)
(general location)

Source: Ferris State University













...
Benton Harbor

Code:
Benton Harbor Flats rehabilitation, under construction ($4.5 million)
corner of Pipestone and West Main Streets

Source: Moody on the Market

Whirlpool Apartment development, proposed ($22 million)
170 Riverview Dr.

Source: WNDU News 16 | Courtesy Whirlpool Corp.

The Corner at Wall Street, proposed (~$18 million?)
(general location)

Source: Moody on the Market

Twin Cities Harbor Planning Study, visioning, 2015
Concept view of mixed-use development at central dock / inner harbor
(general location)

Source: Southwest MI Planning Commission

Farmers & Merchants Bank Façade Restoration, completed 2019 ($150,000)
92 W. Main St.

Source: MiBiz | Courtesy Rendering

Houndstooth Restaurant & Lofts, completed September 2019 (~ $1.25 million?)
132 Pipestone St.

Source: Herald-Palladium | Don Campbell

The Eddy, completed 2019 (~ $3 million?)
1900 Paw Paw Ave.

Source: LinkedIn | Abonmarche

200 Water Street, completed 2016 (~ $2 million?)

Source: Google Maps

LMC Hanson Technology Center, completed April 2016 ($10.6 million)
2755 E Napier Ave.

Source: AMI

Saranac Flats, completed 2014 (~ $4 million?)
376 W Main St.

Source: apartmenthomeliving.com

Harbor Shores Golf Resort, opened 2010 (ongoing investments, $500+ million)
201 Graham Ave.

Source: Crain's Detroit Business | Courtesy Harbor Shores
Albion

Code:
Albion College Body and Soul Center, under construction ($48 million)
(general location)

Source: Albion College

Downtown Courtyard by Marriott, completed March 2018 ($10 million)
200 S. Superior St.

Source: Kayak
















...
St. Joseph

Code:
Krasl Art Center Gateway Project, completed late 2018 ($1.7 million)
"Rising Crossing Tides" sculpture by Richard Hunt
707 Lake Blvd.

Source: Pat Moody | Moody on the Market

Lake Park Place (2010 proposal - dead)
(general location)

Source: Facebook (link is now dead)


















...
Three Rivers

Code:
Metro @ Maple Lane, completed July 2021 (~ $2 million?)
(general location)

Source: My own photo

Bronson Primary Care Partners, completed July 2020 (~ $6 million?)
601 S. US 131

Source: Google | Andrea Whitney

Armstrong Park Sports Complex, completed spring 2020 (~ $6 million)
(general location)

Source: WWMT | Three Rivers Area Community Foundation

Three Rivers Hospital, demolished late 2022 ($1.3 million)
(general location)

Source: Facebook | Becca Yeske
Hudsonville

Code:
Hudsonville Public Schools 2019 Bond, approved ($140 million)
Various projects. Pictured: New 5/6 Building at Georgetown (general location)

Source: GMB

Hudsonville 2030 Master Plan, multi-phase; ongoing (~ $30 + million)
(general location)

Source: Imagine Hudsonville 2030

Hudson Center (Mixed-Use Development), completed late 2018 ($4.5 million)
3424 Chicago Dr.

Source: Midwest Construction














...
Hastings

Code:
Affordable Housing Project, proposed / on-hold due to arson at Royal Coach building
(~ $20 million?)
(general location)

Source: WZZM 13
























...
Marshall

Code:
Ford BlueOval Battery Park Megasite, under construction ($3.5 billion)
(general location)

Source: choosemarshall.com

Schuler’s Restaurant & Pub Apartments, proposed (~ $3 million?)
115 S Eagle St.

Source: Second Wave Media | Driven Design Studio

Eaton Park, proposed ($3 million)
(general location)

Source: Second Wave Media | City of Marshall

Ketchum Park Millrace Pavilion, completed Summer 2020 (~ $200,000?)
(general location)

Source: Viridis Design Group




























...
Rockford

Code:
Hotel Rose, proposed (~ $14 million?)
12 S. Main St.

Source: MLive | Ghafari / Concept Design

Malph's Pizza Pub (former Vitale's Pizza), proposed (~ $1 million?)
(general location)

Source: GRBJ | Courtesy Rockford Brewing Co.

Corner Bar reconstruction, completed August 2018 (~ $1.5 million?)
31 N Main St.

Source: Trip Advisor



















...
Dowagiac

Code:
Dowagiac District Library Expansion, completed May 2021 ($7.5+ million)
211 Commercial St.

Source: Herald Palladium


















...
Zeeland

Code:
Gentex Expansion, proposed ($300 million)
(general location)

Source: The Holland Sentinel | Courtesy Gentex

Sligh Furniture Co. building repurposing, proposed (~ $3.5 million?)
349 E. Main Ave.

Source: Holland Sentinel | Carolyn Muyskens

Gentex Discovery Preschool, proposed (~ $3 million?)
(general location)

Source: The Lakeshore | Courtesy

Avid Hotel, completed late 2020 (~ $11 million?)
8225 Westpark Way

Source: LinkedIn | 360 Photo & Design






















...
Allegan

Code:
Downtown Hampton Inn, proposed (~ $10 million?)
101 Brady St.

Source: Facebook | Friends of the Riverfront

Tantrick Brewing Co. Expansions, proposed (~ $1 million?)
34 Water St. & 243 Hubbard St.

Source: The Lakeshore West Michigan

Armintrout-Milbocker Nature Preserve, completed October 2022 (~ $3 million?)
137 Thomas St.

Source: Second Wave Media | Bruce Howe







...
Coopersville

Code:
Bay Logistics Cold Distribution Center, proposed (~ $60 million?)
275 N. 68th St.

Source: GRBJ | Courtesy Bay Logistics




















...
South Haven

Code:
Bronson Wound Center & Surgical Services, under construction (~ $3 million?)
955 S. Bailey Ave.

Source: Bronson Health

Bronson South Haven New Hospital, completed May 2021 ($22 million)
955 S. Bailey Ave.

Source: Bronson Health

South Haven Center, completed November 2019 ($4.5 million)
335 Center St.

Source: South Haven Center




...
Wayland

Code:
Gun Lake Casino Phase 5 Expansion (Resort Hotel), under construction ($300 million)
250,000 SF, 250-room Hotel, Dining, Pool & Spa Expansion
1123 129th Ave.

Source: yogonet.com

Gun Lake Tribe US 131 Frontage Development, proposed (~ $100 million+)
(general location)

Source: MiBiz | Kaylee van Tuinen

Gun Lake Casino Phase 4 Expansion, completed September 2021 ($100 million)
72,000 SF of additional new dining, entertainment, & gaming space
1123 129th Ave.

Source: Holland Sentinel | Contributed

MRCC Union Hall and Apprentice Training Center, completed December 2018 ($14 million)
500 Reno Dr.

Source: My own photo

Gun Lake Casino Phase 1-3 Expansion, completed late 2018 ($76 million)
Parking deck, "High-Limit" gaming room, dining, entertainment, & gaming space
1123 129th Ave.

Source: Gun Lake Casino




...
Plainwell

(reserved)

Middleville

Code:
Middleville Main, proposed ($2.8 million)
(general location)

Source: Wood TV 8 | Courtesy MEDC






































...
Barry Township

Code:
Gilmore American Muscle Car Museum, proposed (~ $4.5 million?)
6865 W Hickory Rd.

Source: Schley Nelson Architects






...
Paw Paw

Code:
New Fire Department, under construction ($5.9 million)
(general location)

Source: MLive



















...
Whitehall

Code:
Tannery Bay, under construction (multi-phase)
(general location)

Source: My own photo, taken 3/12/24

Harwood Flats, under construction ($8.5 million)
(201 W Colby Street / 115 Lake Street)

Source: MLive | Integrated Architecture
















...
Spring Lake

Code:
Tanglefoot Park renovation, proposed ($3.5 million)
312 W Exchange St.

Source: Google Maps

Epicurean Village Mixed Use, completed Summer 2020 ($6 million)
110 W Savidge St.

Source: Epicurean Village

The Lilley Mansion B&B, completed Summer 2020 (~ $1 million +?)
113 S Division St.

Source: MLive

Brooklyn's Bagels, completed Fall 2019 (~ $500,000?)
411 W Savidge St.

Source: Urban Planet | mgreven









....
Cassopolis

Code:
Village Improvements, ongoing ($20+ million)
(locations vary)

Source: Bryan Esler | Second Wave Media

New Municipal Building, completed October 2020 ($2.8 million)
121 N Disbrow St.

Source: Moody on the Market




















...
New Buffalo

Code:
The Harbor Grand Hotel Reconstruction, completed 2020 (~ $7 million?)
111 W Water St.

Source: Instagram | @rockfordconstruction

Downtown Streetscape Improvements, completed June 2018 ($4 million)
(general location)

Source: Houseal Lavigne Associates

Village Park Square (2006 proposal - partially built; demolished early 2016) 
(general location)

Source: PRweb

















...
Berrien Springs

Code:
BSPS Arts and Athletic Center (AAC), completed July 2022 ($19.7 million)
201 Sylvester Ave.

Source: My own photo

BSPS Sylvester Stadium, completed August 2020 ($8 million)
201 Sylvester Ave.

Source: LinkedIn | CARMI Design Group, Inc.






















...
Stanton

(reserved)

Centreville

Code:
Glen Oaks Community College Grand Concourse Remodel, completed 2020 ($3 million)
62249 Shimmel Rd.

Source: Frederick Construction


















...
Douglas

Code:
St. Peter Catholic Church Remodel & Addition, under construction (~ $6 million?)
100 St Peters Dr.

Source: OAK | Courtesy Progressive AE


















...
Saugatuck

Code:
Saugatuck Public Schools Bond Projects, multi-phase; ongoing ($35.6 million)
(various renovation projects & locations - More Info)

Source: Holland Sentinel

NorthShore of Saugatuck Marina & Housing Development, under construction 
(~ $25 + million)
(general location)

Source: NorthShore of Saugatuck

Guardian Brewing Company, completed January 2019 (~ 500,000?)
3657 63rd St.

Source: Facebook | Guardian Brewing Company

The Mitten Brewing Company, completed June 2018 (~ $200,000?)
329 Water St.

Source: Brew Studs














...

Last edited by deja vu; Mar 27, 2024 at 8:32 PM. Reason: Updating rundown