Updates on Oakland's 3 under construction tower projects:

1950 Broadway (39 floors/395ft): looks just about topped out, with facade installation most of the way up. It's looking quite prominent on the skyline from a lot of angles.







1510 Webster (19 floors/187ft): As Homebucket shared in the project thread, foundation pour has begun, and I spy a crane base.






2359 Harrison (16 floors/178ft): Up to the third floor, construction remaining active. Feels like this one has been slow to rise so far.

Also note Vespr is complete across the street, with a pretty nice street presence on the corner.




Sorry if these should go in the project threads; thought I'd post here since I took pics of all of them together.