View Single Post
  #584  
Old Posted Dec 6, 2022, 10:23 PM
plrh plrh is online now
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 802
The St Vital Bridge Rehabilitation Project is out for tender. Of note is that the sidewalks will be widened to become 3m wide multi-use paths. It looks like southbound to be completed in 2023 and northbound in 2024.

The design is to cantilever the new path outwards over the edge. Currently the sidewalks are 1.5m wide.
Reply With Quote