View Single Post
  #1960  
Old Posted Jul 27, 2026, 11:21 AM
J81 J81 is offline
Registered User
 
Join Date: Dec 2013
Posts: 817
Quote:
Originally Posted by Nouvellecosse View Post
I remember when there was a discussion about the Halifax to NB rail corridor in another thread maybe a year or two ago. We were able to see that the biggest time villain was the stretch between Truro and Amherst and it was pretty obvious that this was at least partially due to the route being much more meandering and therefore longer than the road. That is mainly because of the Cobequid Hills that the highways cross at gradients too steep for the train. It would be expensive to make a straighter route since it would likely require tunnels and viaducts, although that doesn't mean it can't be done of course.
You are 100% correct. The train also loses a lot of time meandering through the urban areas. It takes 20 minutes to exit Halifax station to Rockingham. It is also 10mph through Truro. 30mph through Amherst and Sackville. Those are where the biggest gains could be made with infrastructure improvements.
Reply With Quote