View Single Post
  #724  
Old Posted Oct 18, 2023, 4:19 PM
ASU Diablo ASU Diablo is online now
Registered User
 
Join Date: Jan 2013
Posts: 2,303
Quote:
Originally Posted by PHX31 View Post
Great pics, thanks for posting. It looks like the shorter of the 2 buildings (on the left) is just about topped out? Maybe 1 more floor to go.
No you were right. The West Tower is topped out.

https://www.bizjournals.com/phoenix/...23-update.html

Quote:
A 1-million-square-foot mixed-use project that has been in the works for four years reached a significant construction milestone on Tuesday.

Development officials, as well as Phoenix Mayor Kate Gallego, celebrated the topping out of the first tower of the Central Station project in downtown Phoenix, which means the final beam was placed on top of the building.

Construction on the first building, called the West Tower, started in early 2022 for the development that's expected to boost downtown Phoenix with new student and multifamily housing, retail, offices and a multimodal transit center with light rail stations on each side of the project, along with a bus station.
Reply With Quote