![]() |
CHICAGO | 170 N. Green (One Fulton Market) | 480 FT | 37 FLOORS
Lamar Johnson Collaborative Architects
275 units 150 hotel keys https://uniim1.shutterfly.com/render/00-...G9A?cn=THISLIFE&res=medium&ts=1665288654 https://uniim1.shutterfly.com/render/00-...MG9A?cn=THISLIFE&res=large&ts=1648082065 https://uniim1.shutterfly.com/render/00-...cOgg?cn=THISLIFE&res=large&ts=1648082060 https://uniim1.shutterfly.com/render/00-...PWWw?cn=THISLIFE&res=large&ts=1648082070 https://uniim1.shutterfly.com/render/00-...ufg?cn=THISLIFE&res=medium&ts=1643140432 |
From the highrise thread:
Quote:
|
Hey, I guess we should be really very thankful Lucien Lagrange couldn't get his hands on this in time!
|
Any timetable on when this will break ground?
|
January 24, 2023
![]() ![]() |
^ Interesting. We haven't seen many of those around these parts, have we? It's typically the truck-mounted variety.
At any rate, folks wondering what's going on with groundbreaking here. CRG (and Shappack in a JV, though my assumption is that in terms of the actual developer here, this is mainly a CRG joint - correct me if someone has deets on structure) must be having a real challenge landing financing because of the office component. I've been wondering about this....do they make it a phased development now instead? Financing for spec office is really scarce right now, and of course quite a bit more expensive than it was not all that long ago (and let's be honest, the standard in Chicago has long been - even in 'easy' debt capital times - you land an anchor tenant, then you land your financing. There may be exceptions, but they are exceptions. |
Anyone know why the small prep work on the site last 2 days?
|
Quote:
|
|
I'd be cool with a redesign on this one. The central location would be a great spot for West Loop's first supertall
|
I'm so excited to see this thing built!
|
Quote:
|
Strange. Appears they are now paving a portion of the lot per the webcam.
https://app.oxblue.com/cameras/828f070371a13cb32c6866403b1d7fd6?openlink=clayco/greenstreetdemo |
I had a feeling that steamroller was up to no good
|
Quote:
|
Heard some unconfirmed scuttlebutt about a new JV partner taking a hard look at this one.
If true, I wouldn't be surprised if we saw a redesign in the not too distant future. |
Quote:
|
Quote:
|
Quote:
Quote:
|
350,000 square feet, about half of the total space, is dedicated to office
|
| All times are GMT. The time now is 1:48 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.