![]() |
Edmonton Construction 9 (2008-08)
**EDMONTON METRO REGION PROJECTS, PROPOSALS, RENDERINGS AND RUMOURS**
http://i151.photobucket.com/albums/s124/240glt/IMGP2883.jpg Renderings and new information (such as rumours, proposals, approvals, etc) are added to this first page on a regular basis, as it becomes available. Information that needs updating or changing status, please PM or add it in the discussion thread. Press "Ctrl-F" if you want to search for projects within this page Press "Esc" if you want quit loading all the numerous images on this thread. Press "Ctrl+F5"If some images do not load right away, this will refresh your Web Browser Edmonton Information: City Population – 752,412 (2008.) Edmonton CMA Population - 1,034,945 (2006.)Edmonton Capital Region Incorporation as Town - 1892 Incorporation as City - 1904 Total Area- 683.88 km² (2004) Elevation– 688 m above sea level Total Area of Parks/Open Spaces - 111 km² (27,400 acres) of parkland. Within a 25 km long river valley park system there are 11 lakes, 14 ravines, and 22 major parks. Branding/Motto - "City of Champions" "Gateway to the North" "Oil Country" Mayor – Stephen Mandel (34th Mayor of Edmonton) Last Municipal Election- Oct. 17, 2007 Next Municipal Election - Oct. 18, 2010 Important Links: Edmonton Edmonton Capital Region Connect2Edmonton - a forum of topics of importance to Greater Edmonton's future. Focus Edmonton: City Plan Alberta Ministry of Infrastructure and Transportation Alberta Ministry of Municipal Affairs and Housing Edmonton Economic Development Edmonton Transit Edmonton SLRT Expansion information PDF Moving Edmonton – Updating the Transportation Master Plan High Speed Transit Planning Study PDF Alberta Municipal Government Act Edmonton Design Committee Revitalization studies, Park developments and Neighborhood plan Links 105 Avenue Multi Use Trail Corridor and Streetscaping Project 109th Street Corridor Study PDF Old Town Fort Road Redevelopment City of Edmonton Downtown Plan Alberta Avenue Initiative Revitalization Study PDF The Quarters revitalization plan Terwillegar Park concept study Stadium LRT station transit oriented development **COMMERCIAL & GOVERNMENT OFFICE** High Rise
**MIXED USE- RESIDENTIAL, COMMERCIAL, OFFICE, HOTEL**
**HIGH RISE RESIDENTIAL**
**LOW RISE COMMERCIAL/ GOVERNMENT/ RETAIL**
**LOW RISE RESIDENTIAL**
**EDMONTON'S EDUCATIONAL, MEDICAL, RECREATIONAL, ENTERTAINMENT AND ARTS FACILITY CONSTRUCTION** UNIVERSITY OF ALBERTA
MEDICAL FACILITIES
RECREATIONAL, ENTERTAINMENT AND ARTS FACILITIES
**EDMONTON TRANSPORTATION AND INFRASTRUCTURE CONSTRUCTION** Edmonton International Airport 2007 - 2012 Expansion Project An additional 13 bridges will be built on the south side of the terminal, boosting the total number of bridges to 30 from the current 17. Phase 1 (completion date 2010): 253,000 square metres of new apron space to accommodate new south terminal development. Phase 2 (completition date 2010): A new "hammerhead" located south of the current airport terminal. Phase 3 (completion date 2012): A new concourse linking the existing south terminal with the "hammerhead", new control & office tower. Source: Edmonton International Airport Expansion http://i151.photobucket.com/albums/s124/240glt/5Q13Z.jpg http://i151.photobucket.com/albums/s124/240glt/aMX0o.jpg http://i151.photobucket.com/albums/s124/240glt/ePM1B.jpg New airport hotel A 192-room Courtyard by Marriott hotel will also begin construction in 2008. The costs for this project will be borne by the developer, Concord Hospitality Enterprises Company, and is not part of the $1 billion airport expansion. Source: Edmonton International Airport Expansion http://i151.photobucket.com/albums/s124/240glt/hpim0278so11.jpg Edmonton LRT Construction http://img393.imageshack.us/img393/3364/futurelrtkp4.jpg South LRT (SLRT) The extension will occur over three phases. Phase 1: Health Science Station Opened January 2006 Phase 2: Health Sciences Station to South Campus Station opens by the end of 2008 Phase 3: South Campus Station to Century Park opens by the end of 2009 http://img137.imageshack.us/img137/6533/map1cv2.gif Belgravia/Mckernan (76 Ave) Station - 2009 http://img393.imageshack.us/img393/4269/76aveiu9.jpg Neil Crawford Station (UofA South Campus) - 2009 http://img401.imageshack.us/img401/9560/southcampuspg4.jpg Southgate Station - Late 2009 http://img141.imageshack.us/img141/3999/southgatelrtcs1.jpg Whitemud LRT Bridge http://img117.imageshack.us/img117/6646/whitemudlrtbridgeuc8.jpg Century Park Station - Late 2009 http://i151.photobucket.com/albums/s124/240glt/post4117398891610d4cc8dhg7.jpg West to Lewis Estates LRT Planning Study (WLRT) The Transportation Department is undertaking a reassessment of the strategic level planning, completed to date, to identify a route for the proposed LRT extension from Downtown to Lewis Estates. The reassessment emphasizes additional criteria including Transit Oriented Development (TOD), regional initiatives and the Goals outlined in the upcoming Municipal Development Plan (MDP) and Transportation Master Plan (TMP). North LRT extension (NLRT) Information pertaining to the extension of the LRT system from Churchill station to NAIT (PDF) Edmonton Freeway/Major Road Construction Anthony Henday Drive http://img176.imageshack.us/img176/2866/ahdmapzx8.jpg Anthony Henday NE - Proposed 2011 for start and beyond. Maybe 2015 before completion Anthony Henday Drive NW Part of the NW portion from Yellowhead to 137 avenue / West Regional Road opened. Tenders due in 2008, Construction to start in 2009 Anthony Henday Stoney Plain Road Interchange Part of the NW portion of the AHD. Construction to start at fist phase of NW AHD Tenders due in 2008, Construction to start in 2009 http://i151.photobucket.com/albums/s124/240glt/ahdsprmw6.jpg 23 Ave and Gateway Blvd - Under Construction http://i151.photobucket.com/albums/s124/240glt/23ave202.jpg http://i151.photobucket.com/albums/s124/240glt/23.jpg Edmonton Ports GreyHound / VIA Rail Hub Architect: O'Neill O'Neill Procinsky Architects Location: 121 Street and Yellowhead Trail at current Via Rail Station Port Alberta http://corporate.edmontonairports.com/business_at_the_airport/port_alberta Location: Edmonton International Airport 13,000 sq. metres of dedicated new cargo apron in 2007 3,000 acres under development plan for 2008 |
Noted. Thanks 240! If you need this spot later on, I can delete and post accordingly.
|
Thread VIII archived, Thread IX begins.
|
Yes, Hardhatdan, I meant to quote an earlier post... oops :haha:
But I still stand by my contention that the MUNI is a boil on the city's ass, and I wish someone had the stones to lance it already! |
Pfft congrats to this thread on winning the battle of Etown construction 9
|
Quote:
And if I hear anyone talk about how such a tall structure would look bad in the Edmonton skyline ... that's right, I'm looking at you, Cold ... |
Images taken by an acquaintance who goes by the pseudonym of Svelte.
Of the lightning the last two hot nights: http://photos-d.ak.facebook.com/photos-ak-snc1/v312/233/8/624081577/n624081577_1652363_1167.jpg http://photos-f.ak.facebook.com/photos-ak-snc1/v312/233/8/624081577/n624081577_1645389_877.jpg |
Go Procura go!
To construct an Apartment House ( 223 dwellings). Location: 10039 - 109 STREET NW Plan NB Blk 8 Lot 39 10045 - 109 STREET NW Plan NB Blk 8 Lot 40 10033 - 109 STREET NW Plan NB Blk 8 Lot 37 - DOWNTOWN Applicant: ARNDT TKALCIC ARCHITECTURE Application Date: 8/18/2008 To construct an Apartment House ( 458 dwellings). Location: 10845 - JASPER AVENUE NW Plan NB Blk 8 Lot 43 10815 - JASPER AVENUE NW Plan NB Blk 8 Lots 44-46 10051 - 109 STREET NW Plan NB Blk 8 Lots 41-42 - DOWNTOWN Applicant: ARNDT TKALCIC ARCHITECTURE Application Date: 8/18/2008 |
Quote:
|
^Holy crap that didnt take long
Glass should be all the way up on the north side of the Prof. building by the end of the week. |
^ & they're moving on the trusses & decking for the front & side pretty quick now. I bet we see the glass going up on the front side by the end of next month
|
WOW!!! Lots of exciting stuff here!
When does construction begin on the Glenora Towers? |
Quote:
|
Great work on the projects list, 240.
Re: 10406 98 ave is now Abbey Lane Tower, new renders were posted a few weeks back; here's the link on C2E: http://www.connect2edmonton.ca/forum/showthread.php?t=7834 Also, should maybe the Qualico Portrait Gallery submission and Alberta Hotel be listed as "Proposed"? |
Quote:
|
Quote:
@ Newf, it looks like if goes to EDC in sept, & covers both Mayfair and the project we've been refering to as Cascadia: H. UPCOMING APPLICATIONS September 2, 2008 INFORMATION SESSION (Closed to the Public) None scheduled. FORMAL PRESENTATION Mayfair Mixed Use Development Permit Application Architecture / ATB - Rick Arndt 10037 – 109 Street NW, 10039 109 Street NW, 10045 – 109 Street NW; 10051 – 109 Street NW; 10845 Jasper Avenue NW; 10815 Jasper Avenue NW Site legally described as: Lot 38, Block 8, Lot NB; Lot 39, Block 8, Plan NB; Lot 40, Block 8, Plan NB; Lot 41, Block 8, Plan NB; Lot 42, Block 8, Plan NB; Lot 43, Block 8, Plan NB; Lot 44, Block 8, Plan NB; Lot 45, Block 8, Plan NB; Lot 46, Block 8, Plan NB |
If it helps any, here's the link to the Qualico proposal, but dunno if you can use any of the images:
http://qualicoedmonton.com/commercial/station/documents/ThePortraitGalleryofCanada_000.pdf And a couple of images of the old Alberta Hotel here: http://www.connect2edmonton.ca/forum/showthread.php?t=5401&page=2 Can't find any images of Gene's actual proposal, though. |
go procura go....we definately need some more rental stock downtown...especially NEW rental.
|
Holy crap. I've never realized how big of a shitload of construction projects are going on in this city and an even larger shitload of proposals that probably stand a good chance of going through. I don't know why so many Edmontonians are consistently bitching that "it isn't enough". How much more is there to be had? I think we are givin er' at a pretty respectable level in comparison with the rest of the country.
I think that Edmontonians need to stop comparing themselves to Calgary which is what so many do, and that is just plain wrong. This is a great city that is developing at it's own pace, and a pretty darn good one to. To hell with what is going on in Calgary. This city rocks :cheers: |
I don't come in here often, but just thought I'd say congrats on the new thread. Nice first page setup 240glt.
|
| All times are GMT. The time now is 3:34 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.