In the long run, Metra needs to start running frequent regional service - maybe not all the way out to Harvard and Manhattan, but definitely to inner-ring suburbs and certainly to the parts of Chicago that are close to a Metra line but nowhere near the L. Service to communities further out should run less frequently to discourage sprawl - these exurban services can still terminate downtown. Also in the long run, the dramatic increase on regional Amtrak service under the MWRRI will start to eat up many of the existing tracks, and regional passengers need longer to board because of their bags, the ticket-checking procedure, security, and whatever other obstacles Amtrak manages to come up with. Quote:
Lake Street Interlocking Yard Upgrades/Dispatching Center In the end, it won't be enough for the hub of all American railroads. The last time we had massive passenger volumes traveling through Chicago, we had 6 massive terminals. Today, we know that all intercity trains should be centralized, and we have a perfect facility to do it - but that leaves a lot less room for Metra when all is said and done. |
Quote:
How busy is Olgilve? Does the former CNW depot have excess capacity to take on some Metra trains to make room for the increased Hiawatha service and proposed 2nd daily run of the Empire Builder: Chi-Milw-St.Paul? Or is the north concourse of CUS not as overtaxed as the South concourse? |
Whenever I’ve seen a specific reference to congestion and capacity at Union Station (beyond the basic “Union Station is at/approaching capacity) it always focuses on the southern terminal. Given that the northern terminals only have to deal with the Milwaukee District trains, NCS, Hiawatha and Empire Builder, I don’t think there’s any need to shift traffic from Union Station’s north terminus to Ogilvie.
I’ve seen vague statements about Ogilvie approaching capacity in the Central Area Action Plans, but nothing specific. |
There is plan to move the Metra SWS to LaSalle from the south side of Union Station. It's part of the CREATE 75th St Corridor Improvement Project. Though at 2tph peak, removing SWS will have a minimal impact on Union Station congestion. The bigger reason I think is just to be able to run more SWS trains period.
|
^^ Yep. SWS only runs 2tph because there's no room for any more at Union. It serves some of the fastest growing suburbs in Chicagoland, so you bet Metra wants to capture those riders with more frequent service.
Quote:
It could probably be done, but expect UP to drag their heels for years. Also, as you mention, the north platforms at Union are less congested. The Madison St stairs are quite helpful, since commuters can access their trains from both ends of the platform and the trains load faster. |
IRM March 25, CTA "L" Charter 1/2 Sold Out
The Illinois Railway Museum is sponsoring a third straight six car CTA "L" charter, The Snowflake Special, Sunday, March 25. The previous two annual charters completely sold out and this year's charter is outpacing last year's sell-out. In olden days these charters were called "inspection trips" because they often went into yards and travelled on other non-revenue tracks and the 2012 Snowflake keeps that heritage alive, starting with the Harlem yard in Forest Park and going all the way to the lower yard at 63rd and Calumet at the other end of the Green line for example. Lines covered by this year's charter include Green, Pink, Blue, Purple, and Yellow. The Blue is as far as Jefferson Park, the Green as far as East 63rd/ Cottage Grove, to Dempster/Skokie on the Yellow and Linden on the Purple. Lunch will be at four stops around the Loop as usual. Photography is encouraged with photo stops and photo runbys and knowledgeble persons are available to respond to questions. The six car consist will be 2400 series Boeing cars expected to be retired within the next two years. The charter is also a fund-raiser aimed at preserving two cars of the 2400 series. Charter details and ticket ordering is available on the IRM website, but time is running short.
http://www3.irm.org/store/index.phpm...ducts_id=\1895 David Harrison |
Regarding traffic management -- I was really talking more about passenger loading and unloading. I came in on a train and unloaded just as tons of passengers were in the concourse waiting to get on a train. All the escalators were going in my opposite direction, which makes for bad passenger flow.
I can't see how they would have good passenger flow with having both Metra and Amtrak sharing the same floor. I would try to create a new basement level for Amtrak passengers, either under the Great Hall or under the concourse (or both). We could even try to move the Amtrak trains to go to the basement level, which would then clear up the entire concourse level tracks for Metra only (we can even add the O'Hare express on this level too). The Amtrak trains could even go under the basement level so that they are through routed. This would double the track capacity of Union. However, I'm not sure that the BNSF and the SWS freight companies would appreciate added commuter trains on their already busy freight network. While we are at it, we might as well move the Greyhound station to be at Union as well, so that most of the transportation options are consolidated at Union. |
SWS is owned by Norfolk Southern, but Metra controls a portion of the route inside the city. It's really a moot point anyway, since NS doesn't really use the line at all except to run freights to their Landers Yard at 75th Street. South of that all the way to the end at Manhattan, there is virtually no freight traffic. When the 75th Street project is done, SWS will be effectively separate from any significant freight traffic along its entire length.
|
Speaking of the SWS and new service at Lasalle, what is the latest on the proposed SES? It looks like they have a final LPA now out of the AA process, have they begun the environmental review yet?
This will clearly depend on the Englewood Flyover which is already in the works. Another flyover also sees to be planned at Dolton Junction. |
Yeah, they'll definitely need one at Dolton Junction (interestingly, the Dolton station would be integrated into the flyover).
Unfortunately, the SES requires the use of the UP tracks through Roseland. The city is seeking to relocate these tracks onto the CN/Metra Electric ROW, both to eliminate grade crossings and to open up UP's ROW for the Red Line Extension and avoid any property takings. On the other hand, the SES improvements would immensely improve the on-time performance of Amtrak's Cardinal and Hoosier State. |
Quote:
BTW, the Medill article seemed gratifyingly tough on Metra -- or maybe I'm just used to the Trib's fawning attitude towards suburban services. |
Chicagoans in general are frustrated with Metra's backwardness. They may not know the finer points of rail operation or TOD strategy, but they want to pay with credit cards, transfer easily to CTA, and NOT get delayed for 3 hours by a harmless thunderstorm.
Metra has this folksy public image that presents the illusion of rider responsiveness - this is best displayed in their 1990s-era newsletter, which is printed in one-color blue and set in Times New Roman despite representing a railroad that carries 300,000 people each day. In reality they are rigidly dogmatic, inflexible, and completely resistant to change or outside suggestion. You know it's bad when it's easier to make politicians compel Metra than it is to convince Metra willingly. Can you explain how the tagging system works on Caltrain? When 40 people get off at a station, is there a line at the machine to tag out? How do they prevent or discourage freeloaders? |
What is the expected completion date for the Englewood Flyover? It would be nice to have occasional photo, or informational, updates in these threads - it might be hard to get down there and to get useful photo angles, but once in a while would be nice. The updates and photos presented at createprogram.org offer next to nothing.
Incidentally the schematic PDF here is a really neat (if terribly abbreviated) graphic of the nation's economy as it relates to Chicago, and of just what made Chicago what it came to be. (Though I suspect the auto flows are net in the opposite direction.) I can't believe that to this day I've never seen one like this; it should be "required reading" in area schools. |
They haven't awarded the contract yet, so there is no progress to update on. Bids are due by March 20, and Metra will probably award the contract soon after that unless there are major issues. Construction will probably begin by summer.
Invitation for Bids (PDF) This is a good illustration of why these projects take so long... the conditions on the site are complex, so preparing the design takes a lot of time - and then each stakeholder must scrutinize the plan and ask for changes. More months of design, months of waiting for design to be approved, etc. In the meantime the politicians can have a "groundbreaking" and everybody pats themselves on the back. Now that Metra is actually bidding out the project, that means the construction documents are completed. Any changes at this point will be quick and done between the engineer and contractor. By contrast, the UP-North project is an organizational breeze, with only one railroad to deal with and a simple set of project goals. |
Quote:
|
Quote:
|
Quote:
|
Yes, it was a photo op. Official sources called it a groundbreaking, and some secondary news sources interpreted that to mean construction would start immediately. The official sources never actually said when construction would start.
|
Quote:
"In reality they are rigidly dogmatic, inflexible, and completely resistant to change or outside suggestion". I can tell you how T R U E that statement is from trying to get then to listen (UNSUCCESSFULLY) for Sixteen Years now: http://www.box.com/shared/jqvpx489un |
Cool.