![]() |
^ WOW! Such an improvement over a gas station, eh?
Anyhow, I guess we've all gotten way off topic here, this being the Transit thread and all.. |
Quote:
|
Quote:
|
Transportation planning looks to 2040
Quote:
Maybe we should all just mass forward this thread in the suggestion box:D |
^ Zzzz...
Another plan that nobody will heed |
bus tracking system
Quote:
|
Quote:
|
Quote:
|
Quote:
If buses are bunched a supervisor will pull stop them and put the people on it and send the empty one aheard or turn it around to get it back on schedule. |
GPS tracking cost?
I posted the below in the Tribune Topix section in regards to the GPS tracking topic. Wanted this forums take on the cost associated with this project.
Does $24 million seem kind of high to anyone else? This kind of technology is found in many high end cell phones, but those cost, what $500 tops? So why the high price tag? How expensive is each unit? Whats the cost of installation per bus and the cost of linking it to the CTA'S website? A GPS tracker costs (quick Internet search) roughly $500. Lets say installation of each unit is $1000. The CTA website says they have 2000 buses in their fleet. So that means.... 2,000 buses x $1,500 per unit and installation = $3 million dollars.... So where is the other $21 million going? It doesn't cost $21 million to link a bunch of GPS trackers to a real time website! Low Jack, the anti theft device cost $1,200... Its the same freaking technology!!! And from the story it doesn't seem like this will be on all 2000 buses the city runs, it sounds like half. So were paying $24,000 per bus for a GPS tracker... |
Quote:
|
Chicagoans -
Ian Wright, British host of The Travel Channel's "America: the Wright Way", toured Chicago tonight. He took the el and seemed visably impressed. He remarked that it was cleaner and much more spacious than the Tube. And he liked the fact that it afforded an above-the-street view of the city. |
Quote:
|
^ I've ridden both. I think they are both equal in their cleanliness (frankly, I don't know what's up with a lot of you Chicagoans and your "the L is so filthy!" nonsense), but Chicago's train cars are definitely more spacious than London's, IMO.
|
Quote:
|
Quote:
The LoJack is not constantly broadcasting, it's just activated if the car is stolen, so while they use similar technology it's not exactly the same. And you said LoJack is $1,200, right? But you're only allowing $1,500 for the CTA's more robust, more flexible product? Plus, if you consider LoJack to be like a Gateway PC, and what the CTA is getting to be like a dedicated Linux server purposed for a high-availability system, you kinda start to see the difference. A basic Gateway PC can be had for $500, but a solid, reliable server may run you 5 times that (maybe more). They also have to be built to handle relatively rough conditions, and, I would assume, to broadcast at a higher average power than most cell phones to ensure a stable connection. Finally, the central parts of the system, built to be reliable, would have to be fairly robust and that doesn't come cheap, and I don't know how much the software to tie them all together costs, but I do know that logistics software usually isn't cheap. Hiring people to administer the system doesn't come cheap, either. Do I think $24 million seems high - yeah, at least a little. Do I think it's unreasonably high? No, I don't. |
Quote:
|
Quote:
We need a best buy formula for everything CTA purchases.....best bang for the buck...short term along with long term...not "cheapest" short term horribly expensive long term. As far as this system being over priced...guess I would have taken your points a little more seriously if you would have an exact comparision...from say other cities and their systems. Apples to apples. Plus.....do phone companies really keep track of your phones where abouts (all of them) and broadcast that out live? |
Quote:
|
Quote:
|
CTA just announced some significant service increases on several south lakeshore routes:
http://www.transitchicago.com/news/w...ticleid=110240 This improvement in frequency makes the CTA service ever more desirable than the parallel Metra Electric service, in which Metra apparently has little interest in beefing up. Particularly for South Shore residents who are stuck riding local all-stop trains downtown, the CTA express buses (particularly the #14 and #26) generally provide a faster option that probably picks them up closer to their front door. The #2 actually distributes people to/from major trip generators in west Hyde Park (the hospital and dense apartment blocks) who otherwise have a significant hike to Metra. The #6 closely parallels the Metra Electric and isn't any faster, but now runs with such good frequency that it is always a good default option that requires no trip planning and much quicker access time. Exit question for you all: These CTA improvements, - Good thing or bad thing? Detrimental to Metra? |
Quote:
|
Quote:
|
Quote:
|
Quote:
|
Quote:
The parallel bus service isn't that bad, but it kind of sucks that a lot of people living farther south sit through a 15-minute crawl along a local route before reaching the express portion. Also, it would really help tie the lakefront South Side neighborhoods together if you could take rapid transit between the neighborhoods, rather than only being able to get downtown from any given neighborhood. The shape of the lake makes it impossible to get between, say, Bronzeville and South Shore without taking two buses, but the Electric would allow for this very nicely. |
Quote:
|
from the Sun Times
http://www.suntimes.com/news/transpo...032608.article Quote:
|
Monroe, Clark & Division, and North & Clybourn all need face lifts as well - particularly the first two. And are they EVER going to get Washington finished? I never see any work being done there.
|
^Some of us are working to get these three stations preserved and restored, rather than remodeled. The state office of historic preservation is raising all kinds of spurious roadblocks, claiming to have "lost the file" several times.
|
Quote:
All work is being performed inside a closed off area, so nothing is visible to passing trains. |
Quote:
|
Quote:
|
Quote:
|
Quote:
|
Quote:
|
Quote:
|
People still have this idea that the Green Line is empty all the time, but in 2007 the Lake branch alone had almost as many passengers as the Orange Line, and the same number as the Forest Park Blue Line. And ridership on the Lake branch is going way up, in contrast to most of the other lines. And the stations are certainly in very good shape.
|
Quote:
Attitudes will change... Taft |
Quote:
The South Main still has incredibly low ridership though; I think the riders-per-route-mile might even be a bit less than the Pink Line; it's close. |
Quote:
I wonder how high Pink Line ridership will eventually climb now that rebuilding is done. East of Kedzie or so it is very dense, but a larger proportion of the population is not Loop-bound. |
Big day on the CTA today. Southport and Diversey reopened, while Paulina and Wellington closed. Additionally the three track service in the southbound direction has begun at Belmont & Fullerton.
I also noticed the CTA has a new design for the main page of their website. Their system map still needs to be updated though. It's been showing Montrose and Addision closed on the brown line, despite the fact they've been open for 4 months now. Not to mention several other stations are now open and/or closed. |
Quote:
|
Quote:
|
Quote:
|
Anyone notice a difference in loads on the incoming brownline today? I saw their 8 Car signs up yesterday.
|
Quote:
|
Quote:
|
Quote:
Once they're back to four tracks, they may run the same number of trains as before the project and with more cars each, but if ridership declines because of the economy declining (or any other reason) then they probably will run fewer trains but in an eight-car configuration at rush hour. It would save them some operational costs (theoretically, at least, with fewer operators required for the same total line capacity). It would also save them the cost of additional rolling stock. But the capacity would be there, so it'd probably be used sometimes. The length in platforms could also open the possibility of alternative routes, like a Kimball-Midway or Kimball-Oak Park type routing. |
Quote:
Unfortunately, people went to the spot on the platform where they always did, so the middle areas of the trains were crushingly crowded and most people south of Belmont weren't able to board. The front and end cars had a lot of free room though. I assume people will figure this out REALLY quick. I took the Brown Line, and immediately went to the very end of the platform, since I assumed people wouldn't think to go there. There was barely anyone in my car, but the front ones were at capacity. It seemed like a vast majority of people didn't know the trains were longer. I'm guessing the average rider couldn't tell you how long the cars were historically, let alone that they're longer now. I don't know why people don't figure this out.......I never ever went to the middle of the brown line as it was. It was always full of lazy people who just stood right by the top of the stairs. |
All times are GMT. The time now is 6:14 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.