Busy Bee Jan 9, 2021 2:26 AM

Annnnnnnndddddd killed by the other Republicans in 3....2....1......

ardecila Jan 13, 2021 6:12 PM

Big beam lift at the Belmont Flyover...
Good photos and drone video.

https://www.instagram.com/p/CJ3gX8ylsfU/
https://www.instagram.com/p/CJ6Z4VwhMtH/

k1052 Jan 13, 2021 6:42 PM

Best Metra news I've seen in a long time:

Metra Board approves purchase of up to 500 modern railcars.

The Metra Board of Directors today approved the purchase of up to 500 state-of-the-art railcars from Alstom Transportation Inc., opting for new multilevel cars that will be more comfortable, accessible, reliable and safe than the outdated gallery cars they will replace.

Video Link


https://metrarail.com/about-metra/ne...odern-railcars

Chi-Sky21 Jan 13, 2021 6:43 PM

Very cool. Looks like just barely enough clearance for a train, could just be the perspective of the shot though.

Busy Bee Jan 13, 2021 6:54 PM

While the new cars are indeed excellent news, what in god's name does Metra have against a proper cab car, handsomely styled like the rest of the world enjoys? The headscratching doggedness of Metra's horrible 1980s logo as well...

sentinel Jan 13, 2021 7:17 PM

OMG those look incredible! Huge improvement.

ardecila Jan 13, 2021 8:43 PM

This is HUGE. Level (or near level) boarding will allow far more efficient and reliable operations. Proper bike storage is excellent news for reverse commuters, or even traditional commuters who work outside walking distance from the downtown terminals. No longer can Metra deny bike riders access on the whim of a conductor (it's no fun being stranded in the suburbs for 2 hours because the conductor doesn't feel like letting you on).

It's unfortunate that Metra has to be dragged kicking and screaming into a slightly more modern railcar design after zero manufacturers offered to continue building the 1950s style gallery cars. I was worried Metra would just sweeten the pot and offer to pay even more outrageous prices to somebody so they could cling to the gallery car. Looks like the reality check finally sank in.

Quote:

Originally Posted by Busy Bee (Post 9158459)
While the new cars are indeed excellent news, what in god's name does Metra have against a proper cab car, handsomely styled like the rest of the world enjoys? The headscratching doggedness of Metra's horrible 1980s logo as well...

Metra sometimes puts cab cars in the middle of a consist (two short mid-day trains roll into downtown, then they are linked into a longer outbound train for PM rush). An aerodynamic cab car would look awkward in the middle of a train, and potentially would not allow for a gangway connection.

I'm honestly excited this is Alstom. The railcars are nobody's idea of beautiful, but the interior looks pretty nice. Out of the major manufacturers, Alstom definitely has the edge on design, with a clean but not spartan French sensibility. AFAIK Metra will be the first railroad to use these cars, although they are broadly similar to the Hyundai Rotem bilevels used in Massachusetts and California.

k1052 Jan 14, 2021 3:42 AM

It occurs to me that these cars are going to disgorge their passenger loads muuuch faster than the gallery cars. The narrow platforms at CUS don’t stand a chance. If Amtrak and Metra can ever resolve their feud perhaps they can convert the disused baggage platforms as previously envisioned.

Steely Dan Jan 14, 2021 4:59 AM

WOW!!!!!!

Contemporary car design for chicago's dinosaur commuter rail system.

Who woulda thunk it?

nomarandlee Jan 14, 2021 6:25 AM

Can't wait for these to come online. I plan to look up their schedule in order to make a special trip in the first weeks of their arrival.

ardecila Jan 14, 2021 11:36 PM

Quote:

Originally Posted by k1052 (Post 9159074)
It occurs to me that these cars are going to disgorge their passenger loads muuuch faster than the gallery cars. The narrow platforms at CUS don’t stand a chance. If Amtrak and Metra can ever resolve their feud perhaps they can convert the disused baggage platforms as previously envisioned.

Yeah that would be ideal. The baggage platforms are column free too.

Might be more complicated on the north side where they have the exit stairs to Madison though.

jpIllInoIs Jan 15, 2021 1:40 AM

Quote:

Originally Posted by k1052 (Post 9159074)
It occurs to me that these cars are going to disgorge their passenger loads muuuch faster than the gallery cars. The narrow platforms at CUS don’t stand a chance. If Amtrak and Metra can ever resolve their feud perhaps they can convert the disused baggage platforms as previously envisioned.

The key for level boarding is faster boarding/unboarding at station stops. Cumulatively this could cut several minutes off commutes. Trains have plenty of time to unload at the CUS/Ogilvie/LaSalle Terminals terminals. Big bonus for Ravenswood, Glenview, ArlHts, Elmhurst will function much better. And bikes will be much easier to load.

k1052 Jan 15, 2021 4:18 PM

Quote:

Originally Posted by jpIllInoIs (Post 9160355)
The key for level boarding is faster boarding/unboarding at station stops. Cumulatively this could cut several minutes off commutes. Trains have plenty of time to unload at the CUS/Ogilvie/LaSalle Terminals terminals. Big bonus for Ravenswood, Glenview, ArlHts, Elmhurst will function much better. And bikes will be much easier to load.

To clarify I'm all for (mostly) level boarding. My concern is limited to CUS where the passenger platforms are narrow and crowded with columns creates a safety issue next to active track. It's a relatively easy problem to fix though.

Mister Uptempo Jan 16, 2021 8:43 AM

Quote:

Originally Posted by k1052 (Post 9158445)
Best Metra news I've seen in a long time:

Metra Board approves purchase of up to 500 modern railcars.

The Metra Board of Directors today approved the purchase of up to 500 state-of-the-art railcars from Alstom Transportation Inc., opting for new multilevel cars that will be more comfortable, accessible, reliable and safe than the outdated gallery cars they will replace.

1) I've searched through both Metra's and Alstom's sites, and can't determine whether there will be a significant difference in capacity between the old gallery cars and the Coradia multilevels. Has anyone found any specs?

2) I noticed that the cab compartments on the Coradia cars are located at mid-level, as opposed to the upper level on the gallery cars. Potential hazard, with the decreased field of vision? Was it the price that had to be paid to provide easier access to the HVAC units?

3) Curious about gross weight of the car and whether the Coradia could have been the bi-level railcar the Midwest states were looking for from Nippon-Sharyo. Could this platform serve as a replacement for Amtrak's Superliner?

electricron Jan 16, 2021 1:37 PM

Quote:

Originally Posted by Mister Uptempo (Post 9161804)
1) I've searched through both Metra's and Alstom's sites, and can't determine whether there will be a significant difference in capacity between the old gallery cars and the Coradia multilevels. Has anyone found any specs?

2) I noticed that the cab compartments on the Coradia cars are located at mid-level, as opposed to the upper level on the gallery cars. Potential hazard, with the decreased field of vision? Was it the price that had to be paid to provide easier access to the HVAC units?

3) Curious about gross weight of the car and whether the Coradia could have been the bi-level railcar the Midwest states were looking for from Nippon-Sharyo. Could this platform serve as a replacement for Amtrak's Superliner?

With a slight redesign, yes they could be a replacement for Superliners.
What would they need to redesign?
(a) move the vestibules between cars to the upper level.
(b) move the air conditioner and other auxiliaries down to the area below the upper level but above the trucks/wheels
(c) move the stairway between upper and lower levels towards the center of the car
(d) add more restrooms and tanks.

nomarandlee Jan 20, 2021 4:40 PM

Quote:

https://trn.trains.com/news/news-wir...after-pandemic


Metra's Derwinski expects permanent change to schedules in wake of pandemic
CEO hopes for more midday, weekend service, would like to try 'regional rail' frequency; also talks about equipment, outreach to businesses

By David Lassen | January 19, 2021

......An emphasis on service during the traditional morning and evening rush hours will likely remain.

“Trains may be shorter, they may not be as frequent, but definitely [will address] the things that people want — express trains from where they’re at, the busiest stations downtown, that sort of thing,” Derwinski said. The big changes, though, are likely to come outside of those windows; Derwinski says he foresees more midday and weekend trains.

“We’d love to start experimenting,” he says, “and I’m trying to work with one of our partners to try something that I’ll call regional rail, where trains are much more frequent. Maybe they’re every half-hour, and during rush hour, every 15 minutes. It lets people know there’s always going to be a train to come — not as fast as rapid transit, but definitely more enhanced than the one- or two-hour windows we have now.”.......
..

ardecila Jan 20, 2021 5:04 PM

Quote:

Originally Posted by Mister Uptempo (Post 9161804)
1) I've searched through both Metra's and Alstom's sites, and can't determine whether there will be a significant difference in capacity between the old gallery cars and the Coradia multilevels. Has anyone found any specs?

It's probably a wash. The lost seating on the lower deck from the 2nd vestibule and bike storage is offset by the increased seating on the upper deck. Also the theoretical capacity of the gallery cars is larger than the actual capacity - groups of 2 or 3 often take up 4 seats, the longitudinal bench seats are almost never filled up because of personal space, etc. The new seating style on the Coradias will probably allow for greater utilization.

Quote:

3) Curious about gross weight of the car and whether the Coradia could have been the bi-level railcar the Midwest states were looking for from Nippon-Sharyo. Could this platform serve as a replacement for Amtrak's Superliner?
I think the problem with the Midwest procurement was the ridiculously detailed, obsolete and highly flawed spec. Nippon Sharyo is a capable manufacturer, their failure to build the bi-level cars is a bigger indictment of the transpo officials who literally wrote the spec by committee.

Siemens got very lucky... their Venture cars meet none of the spec requirements (they're not even bilevels) but they had a production line already set up for Brightline and they were the only company who could supply new railcars quickly enough to avoid the states forfeiting their Federal funds.

I've heard the Coradias might be alt-compliance using the new FRA regs, if that's the case they might be lightweight cars. I'm not entirely clear on the conditions where lightweight cars can be used, I know there needs to be some kind of separation from heavyweight trains but maybe all the new PTC will provide enough margin of safety.

electricron Jan 20, 2021 9:06 PM

Quote:

Originally Posted by ardecila (Post 9165514)
I've heard the Coradias might be alt-compliance using the new FRA regs, if that's the case they might be lightweight cars. I'm not entirely clear on the conditions where lightweight cars can be used, I know there needs to be some kind of separation from heavyweight trains but maybe all the new PTC will provide enough margin of safety.

Just about all FRA Alternate Compliance train cars have some sort of engineered crush zones in front of the driver in the cab. I do not see a crush zone on these trains. Therefore, I do not think they will be alternate compliant with that one aspect of the FRA regulations. But time will tell.

Busy Bee Jan 20, 2021 9:24 PM

^ Isnt this sort of an argument FOR a stylized cab car with a nose that contains crash absorption like most other bi-levels on the world market??

Randomguy34 Jan 20, 2021 11:19 PM

Quote:

Originally Posted by Busy Bee (Post 9165809)
^ Isnt this sort of an argument FOR a stylized cab car with a nose that contains crash absorption like most other bi-levels on the world market??

I would think so as well, and that's what MBTA, Caltrain, and SEPTA have started doing with their new procurements.

Quote:

Originally Posted by nomarandlee (Post 9165486)
https://trn.trains.com/news/news-wire/2021/01/19-metra-ceo-foresees-new-approach-to-scheduling-after-pandemic

The past couple of months have made me really hopeful for Metra's future after the pandemic. The agency said during budget meetings that they want to run frequent 22-minute service from Union Station to O'Hare once the A2 flyover is built, the board is considering off-peak fare pricing, they have implemented Fair Transit South Cook and are still negotiating with the CTA to include fare transfers, new coach car procurements that aren't gallery cars, and now they want to adopt regional rail frequencies.

It's possible that over the next decade Metra fully adopts the regional rail model and provides true rapid transit in the city, similar to Paris' RER, the London Overground and Thameslink, and Toronto's GO modernization

SIGSEGV Jan 22, 2021 10:49 PM

Quote:

Originally Posted by Randomguy34 (Post 9165917)
hey have implemented Fair Transit South Cook

Yes, as I found out today when I took the train down to Hyde Park to go into lab for a bit. I'm surprised UChicago hasn't really announced anything about it, although we're still operating at greatly reduced capacity so maybe they don't want to talk too much about getting to campus...

TR Devlin Jan 28, 2021 9:42 PM

How do trains stay on the tracks?

Click here for Richard Feynman's surprising explanation.

ardecila Jan 29, 2021 7:12 PM

Street level renderings for the new Lawrence, Argyle, Berwyn & Bryn Mawr stations:
https://www.transitchicago.com/rpm/whatsnew/

This is a pretty clean modern transit palette, nothing spectacular but the gridded rainscreen reminds me of a budget version of new metro stations in Hong Kong (https://goo.gl/maps/k9MtWndW4xPYDAkW7). And it'll probably be value-engineered down to a white glazed cement block, which I guess is okay.

They need to stop using those awful "neighborhood logos" though. It's better to evoke neighborhood character with materials and forms rather than use a concocted logo that will look awful and confusing in 10 years' time. The "Edge" logo on Berwyn is the worst offender here, it even overpowers CTA's own signage and logos.

Mr Downtown Jan 30, 2021 6:11 PM

Disappointed to see them apparently using segmented box girders for the overpasses. I love continuous box girders, as in California freeway interchanges—but the segmented ones look cheap and ugly within a year.

I realize, though, that it's a staging issue. You don't want to close an east-west street for six weeks to put up falsework for poured-in-place box girders, and dropping in precast beams requires more vertical depth and probably also requires some sort of stringers to support the tracks. Surely there's a shallow precast T- or TT-beam that would work.

Busy Bee Jan 30, 2021 8:53 PM

They could do something fun and give the public something like this, but since its the cta that would be asking too much:

https://www.thisiscolossal.com/wp-co...ew-640x960.jpg
_


Seriously though, if you really wanted to you could spec those segmented cast girders to have a groove detail say every 6 inches or so and get that joint tolerance to match and it would look like one continuous structure. But that's all fussy and whatnot right? Proceed with the "who gives a shit it will only look like this for another hundred years" approach.

ardecila Jan 31, 2021 9:42 PM

Quote:

Originally Posted by Mr Downtown (Post 9175256)
Disappointed to see them apparently using segmented box girders for the overpasses. I love continuous box girders, as in California freeway interchanges—but the segmented ones look cheap and ugly within a year.

I realize, though, that it's a staging issue. You don't want to close an east-west street for six weeks to put up falsework for poured-in-place box girders, and dropping in precast beams requires more vertical depth and probably also requires some sort of stringers to support the tracks. Surely there's a shallow precast T- or TT-beam that would work.

Yeah the segmental ones can (and will) be installed using a moving gantry on the Red Line. This is important because the access to this corridor is tight - it's not practical to bring large cranes and huge beams down those little alleys for traditional steel or precast construction, and demolishing the existing gravity walls of the embankment to create more space is not cost-effective due to the sheer volume of concrete used back in 1920. As it is, they will need to laboriously chip out big sections at each pier location to drill caissons. This also means longer spans are preferable, since the cost of each pier is so high.

With a gantry they can demolish just a few hundred feet of the gravity walls (probably at the station locations) and create drop zones where the precast segments can be picked up by the gantry and then moved down along the corridor to where they are needed.

https://www.transitchicago.com/asset...n_Drawings.pdf

OhioGuy Mar 5, 2021 7:06 PM

I haven'y looked specifically at the COVID relief bill that's with the Senate right now, but I believe I've heard of earmarks for certain transit projects, such as the BART extension to San Jose/Santa Clara here in the Bay Area. Or maybe it's intended for the next big bill that President Biden wants Congress to take up, the infrastructure bill? Anyway, I was curious if there are any Chicago transit projects either slated for an earmark in the current COVID relief bill or would have a good chance for funding in a future infrastructure bill? (of course the specifics of the bill make a difference... plus CTA is presumably just trying to survive at the moment after a year of depressed ridership)

Seems like the red line south extension would be highest on the list of possibilities for significant funding? Is there any push right now for the orange line extension to Ford City Mall? I have long been a fan of extending the brown line under Lawrence Ave from Kimball to at least Jefferson Park (and perhaps from there to O'Hare). High capacity transit connecting Union Station/Ogilvie and Mag Mile/Streeterville (e.g. this)? Should the CTA focus efforts on required studies, environmental impact reports, etc. right now in hopes of advancing them forward with any infrastructure funding that becomes available over the next few years?

Busy Bee Mar 5, 2021 7:34 PM

Quote:

Originally Posted by OhioGuy (Post 9208609)
I haven'y looked specifically at the COVID relief bill that's with the Senate right now, but I believe I've heard of earmarks for certain transit projects, such as the BART extension to San Jose/Santa Clara here in the Bay Area.


Removed just this week thanks to Repub outcry, e.g. "Pelosi's Subway"... Probably wasn't the smartest move to try to slip it in there even if it could be justified as econ relief because any infrastructure project can be justified as a "jobs program" - much in the same way that the Repub's claim the Keystone pipe was some enormous lost jobs opportunity. Specifically with the BART extension, it really makes little difference though as the funding will just be in the infra bill later this year, which Repub's won't vote for either because... they love America so hard???


This probably should be in the SFBA transport thread...

Busy Bee Mar 5, 2021 7:45 PM

Quote:

Originally Posted by OhioGuy (Post 9208609)
Seems like the red line south extension would be highest on the list of possibilities for significant funding? Is there any push right now for the orange line extension to Ford City Mall? I have long been a fan of extending the brown line under Lawrence Ave from Kimball to at least Jefferson Park (and perhaps from there to O'Hare). High capacity transit connecting Union Station/Ogilvie and Mag Mile/Streeterville (e.g. this)? Should the CTA focus efforts on required studies, environmental impact reports, etc. right now in hopes of advancing them forward with any infrastructure funding that becomes available over the next few years?

Those are all worthy projects. But their prioritizing requires vision on the part of the Cta, something I've never been totally convinced of. I would be willing to bet the Brown Lawrence subway/O'Hare extension isn't even something that Cta planners have hanging on their office wall. Pity, but probably true. The Cta (or City Hall, whatever is most effective) desperately needs a Robert Moses type of figure to plan and deliver on radical transportation improvements focused on but not limited to transit. So much potential to create S-bahn style service on some Metra lines, through running, Cta Mid-City, Brown ext, Gray Line, Circle Line, Clinton subway, Light Rail (yes, light rail on some high ridership bus routes if the street can accommodate dedicated lanes), Carroll St LRT, Metra electrification, et al.

ardecila Mar 5, 2021 8:20 PM

Quote:

Originally Posted by OhioGuy (Post 9208609)
Anyway, I was curious if there are any Chicago transit projects either slated for an earmark in the current COVID relief bill or would have a good chance for funding in a future infrastructure bill? (of course the specifics of the bill make a difference... plus CTA is presumably just trying to survive at the moment after a year of depressed ridership)

The funding in the Covid bill is only going to projects that have received an FFGA* - essentially these are projects that are all underway or about to start. Meaning, all the planning work has been done, all the engineering has been completed, and FTA has issued a formal green light. The funding in the bill is covering the local match portion - basically it is the Federal government agreeing to fund a larger portion of the total cost than they otherwise would, freeing up valuable state/local money for other purposes.

The only FFGA project that Chicago has right now is the RPM project on the North Side. Everything else is too undeveloped. The rub there is that the local portion of RPM is funded by a dedicated transit TIF. I think legally those funds can't be used for anything else.

The upcoming transportation bill is more open-ended and could potentially benefit Chicago projects. However, our city will be harmed by the fact that we really don't have anything queued up. The cities that have been most successful with expansions of transit or roads are the ones who have developed plans ready to dust off, which in turn requires a dedicated source of funding for planning/engineering and politicians who will go to bat for transit. A dotted line on a map doesn't cut it.

Here's a few projects that we should expect to move forward. This is already a large and very costly list, so I wouldn't expect to see any big surprises.
  • Union Station revamp would potentially be on tap, but Metra and Amtrak's ongoing blood feud has kept the planning for that project from progressing for several years now. On the plus side, a transit TIF has also been authorized for this project so there is a good source for the local match, but the TIF still needs to be formally created by City Council.
  • Red Line extension has engineering underway and could potentially get an FFGA in 18-24 months' time. If FTA changes their standards to focus more funding on disadvantaged communities like Sec. Buttigieg has promised, it makes this project more competitive than yet another light rail project in Texas or Arizona. A transit TIF is also authorized for this, but the revenues are limited since we're talking about South Side real estate.
  • Congress Branch rebuild. The Forest Park branch of the Blue Line has been crumbling for years - it's older than the Red Line's Dan Ryan branch but has never been rebuilt. Slow zones on this line are endemic. The stations are also woefully out of date, uninviting, and not ADA-accessible. A transit TIF is also authorized for this, but the revenues are limited since we're talking about West Side real estate and I believe Oak Park/Forest Park/Berwyn are not included.
  • Metra railcar replacement. The new car design was already announced but Federal funding could speed up the timeline to replace the old bilevels.
  • CREATE projects... only Phase I of the big 75th St project is funded, so we should expect funding for the later phases of this project which will bring Metra SWS trains into LaSalle St Station.
  • Eisenhower rebuild, Central-Mannheim. This was planned/designed extensively but IDOT basically gave up because the amount of Federal highway dollars coming in was not enough. Sec. Buttigieg is throwing cold water on the idea of expanding highway funding dramatically, especially casting doubt on expansions, but Congress will certainly have different ideas. This has been a big IDOT priority for a long time and they won't give up on it easily. Maybe if they're willing to seriously consider Oak Park's long-standing desire to cap the highway, this expansion might be more palatable to the Secretary.
  • North Lake Shore Drive. Planning for this is ongoing but the wish list is pretty extensive, from bus lanes to pedestrian bridges to new lakefill. On the other hand, this might be the kind of highway project that Buttigieg can get behind for all those reasons.

* = This was actually the wrinkle with the BART project because it was in a special fast-track program and didn't have an FFGA, so it had to be removed under the Senate rules for reconciliation.

k1052 Mar 5, 2021 9:37 PM

Metra should have a pretty well baked set of proposals for an A2 bridge by now that could take money. They also could also use a pile of cash to buy more Chargers. Would like to see a Rock Island electrification too.

ardecila Mar 5, 2021 11:04 PM

^ I don't think anything for A-2 is baked unfortunately and the Rock Island thing is just a wishlist item at this point.

However, one thing I'd like to see out of a "climate focused" transpo bill is a new funding stream for electrification covering both buses and rail transit (and ideally excluding any existing traction systems, except to extend electrification). The availability of funding will persuade legacy systems to electrify. Right now even the East Coast systems have given up on extending electrification. And since the money could also be used for buses, that lets Sunbelt cities get in the game too with battery bus systems or trolleybuses.

Caltrain managed to electrify, but this was under unique circumstances (US' strongest regional economy, the ancient promise to voters to send BART up the peninsula, etc). I don't see other US cities rushing to electrify unless something changes, like a new well-endowed Federal program...

k1052 Mar 5, 2021 11:26 PM

Quote:

Originally Posted by ardecila (Post 9208965)
^ I don't think anything for A-2 is baked unfortunately

Haven't they been studying it since at least 2016? They've got to have SOME idea what they want to do.

electricron Mar 6, 2021 5:25 AM

Quote:

Originally Posted by ardecila (Post 9208734)
The funding in the Covid bill is only going to projects that have received an FFGA* - essentially these are projects that are all underway or about to start. Meaning, all the planning work has been done, all the engineering has been completed, and FTA has issued a formal green light. The funding in the bill is covering the local match portion - basically it is the Federal government agreeing to fund a larger portion of the total cost than they otherwise would, freeing up valuable state/local money for other purposes.

The only FFGA project that Chicago has right now is the RPM project on the North Side. Everything else is too undeveloped. The rub there is that the local portion of RPM is funded by a dedicated transit TIF. I think legally those funds can't be used for anything else.

The upcoming transportation bill is more open-ended and could potentially benefit Chicago projects. However, our city will be harmed by the fact that we really don't have anything queued up. The cities that have been most successful with expansions of transit or roads are the ones who have developed plans ready to dust off, which in turn requires a dedicated source of funding for planning/engineering and politicians who will go to bat for transit. A dotted line on a map doesn't cut it.

I think it is important to state what the FTA programs are and how projects proceed through the process to get Federal funding.
Per https://www.transit.dot.gov/funding/.../about-program
Discretionary & Competitive Federal Grant Program
Roughly $2.3 billion appropriated each year
Funds light rail, heavy rail, commuter rail, streetcar, and bus rapid transit projects

Eligible Projects
New Starts
Total project cost is equal to or greater than $300 million or total New Starts funding sought equals or exceeds $100 million
New fixed guideway system (light rail, commuter rail etc.)
Extension to existing system
Fixed guideway BRT system
Small Starts
Total project cost is less than $300 million and total Small Starts funding sought is less than $100 million
New fixed guideway systems (light rail, commuter rail etc.)
Extension to existing system
Fixed guideway BRT system
Corridor-based BRT system
Core Capacity
Substantial corridor-based investment in existing fixed guideway system
Project must:
Be located in a corridor that is at or over capacity or will be in five years
Increase capacity by 10%
"not include project elements designated to maintain a state of good repair"

Approval Process
New Starts
1) FTA approval: Project Development
Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan
2) FTA evaluation, rating, and approval: Engineering
Gain commitments of all non-5309 funding
Complete sufficient engineering and design
3) FTA evaluation, rating, and approval: Full Funding Grant Agreement
Construction
Small Starts
1) FTA Approval: Project Development
Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into fiscally constrained long range transportation plan
Gain commitments of all non-5309 funding
Complete sufficient engineering and design
2) FTA evaluation, rating, and approval: Construction Grant Agreement
Construction
Core Capacity
1) FTA Approval: Project Development
Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan
2) FTA evaluation, rating, and approval: Engineering
Gain commitments of all non-5309 funding
Complete sufficient engineering and design
3) FTA evaluation, rating, and approval: Full Funding Grant Agreement
Construction

FAST Evaluation and Rating Criteria
New and Small Starts
Project Justification:
mobility
environmental benefits
congestion relief
economic development
cost effectiveness (cost per trip)
land use
Core Capacity
Same as New and Small Starts, except replace land use with capacity needs of the corridor
All
Local financial commitment:
acceptable degree of local financial commitment including evidence of stable and dependable financing sources

Funding Recommendations
FTA’s decision to recommend a project for funding in the President’s Budget is driven by a number of factors, including:
the “readiness” of the project for capital funding
the project’s overall rating
geographic equity
the amount of available funds versus the number and size of the projects in the pipeline

Receipt of Construction Funding
To receive a construction grant agreement a project must:
Complete the Planning, Project Development, and Environmental Review Processes
Meet Project Readiness Requirements (technical capacity, firm and final cost estimate, all funding committed)
Receive a “medium” or higher overall rating
Meet all other federal requirements


My thoughts
The entire process for New and Small Starts takes nearly a decade to complete just to reach the Full Funding Grant Agreement stage. The Full Funding Grant Agreement is the last step in the process before construction can even begin. It is the point where the project is construction ready.

Core Capacity projects are hard to rank high on the evaluations mainly because state of good repair associated costs are eliminated from this grant program. The FTA expects the local transit agencies to maintain their fixed guideways with their own money. If you can't take care of what you have, why give you more of it? If what you have is in good shape but is no longer able to meet the demand in traffic, then core capacity grants can be gained. Making station platforms longer, adding platforms to stations, adding more stations, adding more interlockings, etc. Not adding brand new transit lines, nor rebuilding a station in poor shape, that is not what this program is for.

With more money being given to these programs, more projects will be allowed to move through the entire process faster. Local match percentages can be lower only because more projects with lower rankings will get funded. Transit agencies paying 10% more of the capital costs to get higher rankings above other projects will not be as common when your project will probably get funded at the 10% lower match anyways.

Busy Bee Mar 6, 2021 1:51 PM

Quote:

Originally Posted by ardecila (Post 9208965)
The availability of funding will persuade legacy systems to electrify. Right now even the East Coast systems have given up on extending electrification.

What about MBTA electrification plans?

Mr Downtown Mar 7, 2021 5:49 AM

I really don't understand the hard-on that so many people get for electrification of suburban rail.

It's not really that much greener. Diesel-electric locomotives, of course, are electric locomotives that carry their generators around with them. The inefficiency of having many small generators is not dramatically different from the transmission losses suffered in sending current many miles from a central generating station. Yes, the juice can be generated by wind or solar, but surely trains aren't the lowest-hanging fruit for carbon-neutrality. Get back to me when half of our heating and aircon is done by renewables. Or even half of the auto mileage. If particulate emissions is your worry, lots of other things—natural gas or turbine prime movers, regenerative braking—could be done for a fraction of the cost.

It simply doesn't save that much time in acceleration. UP-North takes 36 minutes to make 16 stops along 14.7 miles of track (Main St Evanston to Fort Sheridan). The much faster-accelerating Metra Electric, featuring high platforms for faster loading, takes 31 minutes to make 16 stops along 14 miles of track (87th St to Flossmoor). When you're only running one or two trains an hour, those five minutes are just not that meaningful. Even if you want the acceleration possible with big electric traction motors, it's not especially important whether you're carrying the generator around with you or leaving it miles away in Dresden. Onboard batteries and regenerative braking—or even just a higher idle rate for the prime mover— can give you more tractive effort to the motors without the expense of stringing and maintaining miles of catenary.

It costs a bloody fortune to string and maintain all those wires. Ontario's study of electrifying the Toronto suburban network found a payback period—even with cheap government borrowing—of a century, longer than the useful life of the asset.

Change my mind.

k1052 Mar 7, 2021 1:35 PM

Quote:

Originally Posted by Mr Downtown (Post 9209878)
I really don't understand the hard-on that so many people get for electrification of suburban rail.

It's not really that much greener. Diesel-electric locomotives, of course, are electric locomotives that carry their generators around with them. The inefficiency of having many small generators is not dramatically different from the transmission losses suffered in sending current many miles from a central generating station. Yes, the juice can be generated by wind or solar, but surely trains aren't the lowest-hanging fruit for carbon-neutrality. Get back to me when half of our heating and aircon is done by renewables. Or even half of the auto mileage. If particulate emissions is your worry, lots of other things—natural gas or turbine prime movers, regenerative braking—could be done for a fraction of the cost.

This is essentally the same argument used against EVs to defend internal combustion and it's just wrong every time. ICEs will aways and forever be much less efficient than tapping the grid. EMUs are way cleaner environmentally and so much quieter than even modern diesel locos not to mention screaming F40s just idling at notch 8.

Quote:

It simply doesn't save that much time in acceleration. UP-North takes 36 minutes to make 16 stops along 14.7 miles of track (Main St Evanston to Fort Sheridan). The much faster-accelerating Metra Electric, featuring high platforms for faster loading, takes 31 minutes to make 16 stops along 14 miles of track (87th St to Flossmoor). When you're only running one or two trains an hour, those five minutes are just not that meaningful. Even if you want the acceleration possible with big electric traction motors, it's not especially important whether you're carrying the generator around with you or leaving it miles away in Dresden. Onboard batteries and regenerative braking—or even just a higher idle rate for the prime mover— can give you more tractive effort to the motors without the expense of stringing and maintaining miles of catenary.

It costs a bloody fortune to string and maintain all those wires. Ontario's study of electrifying the Toronto suburban network found a payback period—even with cheap government borrowing—of a century, longer than the useful life of the asset.
This whole argument presumes that Metra keeps its increasingly ancient exlusively peak centric scheduling approach until the sun burns out. Cutting 5 minutes from a run is very material if you want to have more frequent service and I suspect you could improve upon that in an EMU railcar with more than one fucking door, a non ancient gallery layout, and likely better motors. As for using railroad assets for a century or more...well we would never do that in America now would we?

electricron Mar 7, 2021 2:19 PM

Quote:

Originally Posted by Busy Bee (Post 9209336)

Apparently the MBTA electrification plans are limited to (1) one double track southern line towards Providence and (2) one double track northern line that branches into mostly two single track lines at Beverly. The southern line is already electrified thanks to Amtrak. Although some improvements will probably have to be made to the electrical infrastructure for increasing capacity. The two northern lines are lines with few, if any, freight customers remaining, especially after leaving Boston itself. So hanging catenary wires overhead less than 24 feet above top of rail should not cause any interferences with double stack container trains. I'm not even sure who owns these lines heading north. But if double tracking the remaining single track segments is needed to increase the corridor's core capacity, Federal matching funding might be easier to qualify for. ;)

I never understood why MBTA was not already using electric locomotives on the Providence line? It was already owned the the State, and already electrified. All MBTA basically needed was buying or leasing some electric locomotives, and electrifying their yards. I guess politics, having electric lines from North Station also, was the problem all along.

Back to making it easier to qualify for some Federal matching funds, maybe MBTA should look at converting the northern lines to light rail or metro lines, opening up the possibilities of getting new starts grants? It's not like they do not already have light rail or metro lines. ;)

the urban politician Mar 7, 2021 2:25 PM

Quote:

Originally Posted by k1052 (Post 9209945)



This whole argument presumes that Metra keeps its increasingly ancient exlusively peak centric scheduling approach until the sun burns out. Cutting 5 minutes from a run is very material if you want to have more frequent service and I suspect you could improve upon that in an EMU railcar with more than one fucking door, a non ancient gallery layout, and likely better motors. As for using railroad assets for a century or more...well we would never do that in America now would we?

Last I checked, Metra is not in the business of running trains in order to keep urbanist fanboys happy.

Running a whole bunch of trains off peak so that we can watch empty rail cars go in and out of downtown are probably not the best use of Metra’s limited resources, especially in the Covid “I work from home and I like it that way” world.

Electrifying Metra is not a priority nor should it be. At least for a very long time.

k1052 Mar 7, 2021 2:46 PM

Quote:

Originally Posted by the urban politician (Post 9209960)
Last I checked, Metra is not in the business of running trains in order to keep urbanist fanboys happy.

Running a whole bunch of trains off peak so that we can watch empty rail cars go in and out of downtown are probably not the best use of Metra’s limited resources, especially in the Covid “I work from home and I like it that way” world.

Electrifying Metra is not a priority nor should it be. At least for a very long time.

Off peak service isn't successful because we don't really run it in the first place is top tier suburban living office worker galaxy brain thinking that has kneecapped the agency from evolving.

I am going to so enjoy everybody who thinks they're going to keep working from home being made to drag their asses in every day again. There is going to be such a huge correction that it's going to induce whiplash.

Mr Downtown Mar 7, 2021 7:07 PM

Quote:

Originally Posted by k1052 (Post 9209945)
ICEs will aways and forever be much less efficient than tapping the grid.

Got any citations for that? Remember that DC transmission has enormous line losses, and onboard inverters also have substantial losses. Individual electric cars get recharged from existing AC transmission facilities, typically at low-load times of day.

Nouvellecosse Mar 7, 2021 7:10 PM

Quote:

Originally Posted by k1052 (Post 9209945)
This is essentally the same argument used against EVs to defend internal combustion and it's just wrong every time. ICEs will aways and forever be much less efficient than tapping the grid. EMUs are way cleaner environmentally and so much quieter than even modern diesel locos not to mention screaming F40s just idling at notch 8.

It is a fairly similar argument, but I happen to agree with it in this case. One of the biggest factors that make electric propulsion more efficient is regenerative braking (the main reason why non-plugin hybrid cars are much more fuel efficient than an otherwise similar ICE car). We can see this in the difference between the city and highway fuel economy numbers since the hybrid model has little if any advantage on the highway. This is important because in urban and suburban environments, cars stop... a lot. Red lights, stop signs, cross walks, congestion, etc. But with trains, they usually only stop to let passengers on and off. And with a suburban service, the stops tend to be much more spread out than with urban services. Interestingly there are a couple locomotive makers who have developed a hybrid locomotive which might be able to reduce emissions on suburban routes even further using regenerative braking.

There are other advantages such as noise and operating performance, if looking strictly at emissions there are going to be more effective ways to spend the money at this point. Although if making major service improvements could divert large numbers of cars from the road, that's also something to factor in.

Quote:

Originally Posted by the urban politician (Post 9209960)
Last I checked, Metra is not in the business of running trains in order to keep urbanist fanboys happy.

Running a whole bunch of trains off peak so that we can watch empty rail cars go in and out of downtown are probably not the best use of Metra’s limited resources, especially in the Covid “I work from home and I like it that way” world.

Electrifying Metra is not a priority nor should it be. At least for a very long time.

If working from home does turn out to be a long term trend, that would definitely warrant a shift away from a peak-surge focus toward a constant, all-the-time model. The main users of the service would then be people who can't work remotely and are probably less likely to work standard 9-5 type schedules and instead work various times and at jobs better distributed across the urban area rather than focused in the CBD. There would also be a greater percentage of demand for non-work trips.

I don't necessarily think that a continued work-from-home trend is a death knell for transit. Not only is it more efficient to have service levels spread more evenly rather than surge focused (lower maximum volume needed, easier to schedule, etc.) but I think is may actually discourage car ownership. There are many people who own and operate cars because they feel that's the most practical way to get to work, and needing a reliable transportation option on a daily basis justifies the huge cost of car ownership and usage. But if a person or family isn't using one very often anymore they may need no (or fewer) cars. For those people, transit may be a decent alternative on the occasions when they're making longer trips.

I've heard people make the argument that the downtown condo booms in some cities may be in peril due to WFH, but I'm waiting to see how it actually plays out. The idea is that many people living downtown are doing so primarily for the convenience afforded by a close proximity to work, but I wonder if there are some people who don't mind living out in an uninteresting suburban area that they return to after going into town every week day who may not like being out there all the time. The term "bedroom community" itself implies a place people return to for sleep rather than the setting of a complete life. I wonder if the prospect of spending so much more time at home will make people consider the location of their home to be even more important? I think it could go either way and different people may have different reactions. Overall I would probably just give people more freedom, and people use freedom in different ways.

ardecila Mar 7, 2021 8:55 PM

Quote:

Originally Posted by electricron (Post 9209957)
Apparently the MBTA electrification plans are limited to (1) one double track southern line towards Providence and (2) one double track northern line that branches into mostly two single track lines at Beverly. The southern line is already electrified thanks to Amtrak. Although some improvements will probably have to be made to the electrical infrastructure for increasing capacity. The two northern lines are lines with few, if any, freight customers remaining, especially after leaving Boston itself. So hanging catenary wires overhead less than 24 feet above top of rail should not cause any interferences with double stack container trains. I'm not even sure who owns these lines heading north. But if double tracking the remaining single track segments is needed to increase the corridor's core capacity, Federal matching funding might be easier to qualify for. ;)

It's eminently possible to run double-stacks under catenary. India has done this at scale. Granted, the taller wires might give NIMBYs more fodder to oppose electrification. Overpasses might be an issue also but it's possible to provide the loco or EMUs with a small battery to allow gaps in the wiring.

Chicago has the advantage of public ownership over half the Metra system and multiple redundant routes. Metra could absolutely electrify the Rock Island and Milwaukee District and the freight railroads can't say boo... they are free to purchase trackage rights from a different railroad to move double-stacks through Chicagoland. BNSF and UP-W will probably never electrify sadly, but UP-N and UP-NW are low usage and could likely be purchased by Metra if they were so inclined. HC/NCS probably also out of the question, but SWS could probably be electrified if Metra cuts a deal with NS.

Quote:

I never understood why MBTA was not already using electric locomotives on the Providence line? It was already owned the the State, and already electrified. All MBTA basically needed was buying or leasing some electric locomotives, and electrifying their yards. I guess politics, having electric lines from North Station also, was the problem all along.
Amtrak owns the traction infrastructure and will not allow MBTA to access that power except at astronomical cost. I assume when it was electrified in the 1990s, it was value-engineered with capacity for only a few Amtrak trains an hour (I've seen the costs for this electrification and it's always seemed suspiciously low). Adding the MBTA Providence trains might overload the system, but that's just my speculation.

Quote:

Originally Posted by Mr Downtown (Post 9210133)
Got any citations for that? Remember that DC transmission has enormous line losses, and onboard inverters also have substantial losses. Individual electric cars get recharged from existing AC transmission facilities, typically at low-load times of day.

Who said anything about DC? Metra Electric's 1500vDC system is probably not what would be used for any future electrification in the Chicago area. Any through-routed equipment to/from ME would need to either be AC-native with an inverter or DC-native with a rectifier. But most of the hypothetical network would be running on 25kV AC; Chicagoland is not chock-a-block with low tunnels and low bridges that might force a different technology. In the long run battery technology should allow Metra Electric to convert to 25kv AC as well; the low bridges would just be gaps in the line where the battery power takes over.

k1052 Mar 7, 2021 11:30 PM

Quote:

Originally Posted by Mr Downtown (Post 9210133)
Got any citations for that? Remember that DC transmission has enormous line losses, and onboard inverters also have substantial losses. Individual electric cars get recharged from existing AC transmission facilities, typically at low-load times of day.

Maximum thermal efficiency of an ICE is what 40%. Electric motors are about 90%. Even factoring in transmission losses (which in our case would be low) engines can't close that gap.

Quote:

Originally Posted by Nouvellecosse (Post 9210137)
It is a fairly similar argument, but I happen to agree with it in this case. One of the biggest factors that make electric propulsion more efficient is regenerative braking (the main reason why non-plugin hybrid cars are much more fuel efficient than an otherwise similar ICE car). We can see this in the difference between the city and highway fuel economy numbers since the hybrid model has little if any advantage on the highway. This is important because in urban and suburban environments, cars stop... a lot. Red lights, stop signs, cross walks, congestion, etc. But with trains, they usually only stop to let passengers on and off. And with a suburban service, the stops tend to be much more spread out than with urban services. Interestingly there are a couple locomotive makers who have developed a hybrid locomotive which might be able to reduce emissions on suburban routes even further using regenerative braking.

Who says we can't use regenerative breaking on EMUs? We certainly can if we put some batteries on them which Alstom and Stadler have done.


Quote:

Originally Posted by ardecila (Post 9210205)
Who said anything about DC? Metra Electric's 1500vDC system is probably not what would be used for any future electrification in the Chicago area. Any through-routed equipment to/from ME would need to either be AC-native with an inverter or DC-native with a rectifier. But most of the hypothetical network would be running on 25kV AC; Chicagoland is not chock-a-block with low tunnels and low bridges that might force a different technology. In the long run battery technology should allow Metra Electric to convert to 25kv AC as well; the low bridges would just be gaps in the line where the battery power takes over.

Building out a new DC system would be like ordering a 787 with radial piston engines. Yes, we don't even have to string wire over every foot of rail line. Just enough places to recharge onboard batteries and suck up power from an overhead 25kV AC system.

Nouvellecosse Mar 7, 2021 11:39 PM

Quote:

Originally Posted by k1052 (Post 9210296)
Who says we can't use regenerative breaking on EMUs? We certainly can if we put some batteries on them which Alstom and Stadler have done.

Most of them do have it. That's why i said regen is the main advantage for electric propulsion. My point was just that regen doesn't offer as big an advantage because suburban trains don't stop as often as cars in traffic or even urban trains with short station spacing.

k1052 Mar 7, 2021 11:48 PM

Quote:

Originally Posted by Nouvellecosse (Post 9210299)
Most of them do have it. That's why i said regen is the main advantage for electric propulsion. My point was just that regen doesn't offer as big an advantage because suburban trains don't stop as often as cars in traffic or even urban trains with short station spacing.

I'd probably disagree with that at least somewhat. Also another huge benefit is increased reliability with electric propulsion compared to diesels along with much less required maintenance.

Nouvellecosse Mar 8, 2021 12:05 AM

Quote:

Originally Posted by k1052 (Post 9210301)
I'd probably disagree with that at least somewhat. Also another huge benefit is increased reliability with electric propulsion compared to diesels along with much less required maintenance.

I realise there are other benefits which I mentioned when i said "There are other advantages such as noise and operating performance, if looking strictly at emissions there are going to be more effective ways to spend the money at this point." I was including reliability in operating performance, along with the acceleration and lower NVH (noise, vibration, harshness) levels.

Mr Downtown Mar 8, 2021 12:30 AM

Quote:

Originally Posted by k1052 (Post 9210296)
Maximum thermal efficiency of an ICE is what 40%. Electric motors are about 90%. Even factoring in transmission losses (which in our case would be low) engines can't close that gap.

Thermal efficiency of the generating plant, though, is only around 50%. So it's a pretty small gap, and one that gets even closer when you add the transmission or inverter losses. Unless you have nearly free hydroelectricity, what justifies the incredible capital costs of stringing catenary?

ardecila Mar 8, 2021 2:03 AM

Well, to be fair I think boosting transit usage overall is better for the environment than electrifying the transit system in the short term. If we can move people from cars into buses/trains at a large scale, that alone reduces carbon output per capita even if the buses/trains continue to burn diesel. This is why I think the hype over battery buses is somewhat overplayed. It's not that it's bad technology, but I'd prefer to see limited resources put into increased service.

On the other hand, the traditional role of the Federal government is to fund capital improvements. Covid has upended the normal rules but chances are, the Feds won't pay for CTA, Pace, or Metra to run more service once the pandemic ends. However, they will pay for electrification, as demonstrated by Caltrain or the Denver lines. And a separate lane could be created for decarbonization projects so they don't compete with actual expansions.

Also, if the car fleet is on track to electrify faster than transit systems, then we could reach a point one day where it's cleaner for someone to drive than to ride the bus or train. Of course, the auto-oriented lifestyle is still far more wasteful of all kinds of resources... but it will be very easy for transit systems to lose momentum if they are perceived as dirty and polluting. And electric cars will tend to absolve enviro-conscious people of the many other wasteful aspects in their lifestyle.

Randomguy34 Mar 8, 2021 4:39 AM

RTA is getting $1.5 billion from the new COVID relief bill, final House vote is Tuesday. The funds are intended to cover CTA, Metra, and Pace until 2023.

https://chicago.suntimes.com/columni...rs-cta-chicago