MPLS_Const_Watch Oct 29, 2020 1:03 AM

MINNEAPOLIS | Minneapolis Rebuilds
 
I wanted to start a dedicated thread to covering the rebuilding process for sites left behind by buildings that were fully destroyed by arson during the unrest in May and June. I'm not necessarily opposed to including renovations of damaged buildings here, but I am personally going to focus on trying to document each ground-up new building on the site of buildings that were fully destroyed. I thought it would be helpful to have this as its own thread, rather than mixed in with the Minneapolis general development thread. If any moderators feel differently and think they should be combined, that's fine, but if it's all the same to everyone else, I'd appreciate keeping it separate.

If possible, I'd like to limit the discussion here to the physical recovery of East Lake and other areas that sustained damage. Discussions of police brutality, racism, politics, policy, and crime are all important, but if we could please focus this thread on the physical reconstruction, I would greatly appreciate it.

I've been waiting for the first rebuilding projects to get started so that I could start documenting them. For awhile, Wellington's Midtown Corner was the only site working on a ground-up rebuild, but just in the last week a couple others got started, so I thought it was time to start a thread.

MPLS_Const_Watch Oct 29, 2020 1:08 AM

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 10/28/20
This building was the 6-story affordable housing project under construction that was about 75% built when it was burned and ended up in some pretty widely-circulated photos.

https://i.imgur.com/bxQXU1X.jpg

https://i.imgur.com/5TfDUii.jpg

MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 10/28/20

https://i.imgur.com/e0ttVpV.jpg

https://i.imgur.com/7cibfcm.jpg

https://i.imgur.com/fQYBCzc.jpg

Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 10/28/20

https://i.imgur.com/WRIQlXv.jpg

https://i.imgur.com/xBOd1qS.jpg

https://i.imgur.com/kQksJ42.jpg

Drcastro Oct 29, 2020 3:01 AM

Thanks for doing this.

It seems amazing to me that they were apparently able to salvage the first level of the Midtown Corner project, given the extreme heat it must’ve been exposed to. Nice to see.

MPLS_Const_Watch Oct 29, 2020 3:55 AM

Quote:

Originally Posted by Drcastro (Post 9088756)
Thanks for doing this.

Thanks. I'm anticipating following the reconstruction closely being very therapeutic for me. This has all been personally very difficult. I'm not sure if anyone else who reads here will feel the same, but hopefully folks who don't have a personal connection will at least find it interesting.

Quote:

Originally Posted by Drcastro (Post 9088756)
It seems amazing to me that they were apparently able to salvage the first level of the Midtown Corner project, given the extreme heat it must’ve been exposed to. Nice to see.

They actually did have to take the concrete down due to the heat it was exposed to, even had to dig up the footings and pour anew. Everything that's there now is brand new. It is amazing that they were able to mobilize and get all of that done already!

Wellington also owns the Hi-Lake Shopping Center. It's great to see them leading by being one of the first to begin rebuilding.

Article on Midtown Corner and Wellington's commitment to rebuild: https://www.startribune.com/after-ap...ild/571509542/ .

Drcastro Oct 29, 2020 5:54 AM

Ah, that makes sense. I think one of your pictures has some shadows that I lept to the conclusion were smoke marks. Even more kudos to them for getting this far already.

And you are not the only one for whom this is therapeutic. Watching my own city go through this was very sad.

MPLS_Const_Watch Nov 3, 2020 11:49 PM

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 11/3/20

https://i.imgur.com/v7pa9oh.jpg

https://i.imgur.com/hOGlBBW.jpg

MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 11/3/20

https://i.imgur.com/HxbUmYC.jpg

https://i.imgur.com/1kvM3tt.jpg

Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 11/3/20

https://i.imgur.com/QU0ntwc.jpg

https://i.imgur.com/IUm8Wan.jpg

MPLS_Const_Watch Nov 8, 2020 12:34 AM

AutoZone (312 East Lake St) -- 1 floor -- retail -- 11/7/20

https://i.imgur.com/4rWchnb.jpg

MPLS_Const_Watch Nov 14, 2020 12:51 AM

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 11/13/20

https://i.imgur.com/dus1cJk.jpg

MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 11/13/20

https://i.imgur.com/vUpNJpw.jpg

https://i.imgur.com/qSMe7yc.jpg

MPLS_Const_Watch Nov 20, 2020 8:48 PM

AutoZone (312 East Lake St) -- 1 floor -- retail -- 11/20/20

https://i.imgur.com/4zUndVj.jpg

https://i.imgur.com/rNc4yvi.jpg

https://i.imgur.com/qYg0Fz1.jpg

MPLS_Const_Watch Dec 13, 2020 1:51 AM

AutoZone (312 East Lake St) -- 1 floor -- retail -- 12/12/20

https://i.imgur.com/p7IEeRL.jpg

Speedway (801 West Lake St) -- gas station -- 12/12/20

https://i.imgur.com/1q8ZPQz.jpg

https://i.imgur.com/OS8yplx.jpg

MPLS_Const_Watch Dec 13, 2020 6:03 PM

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 12/13/20

https://i.imgur.com/e0kQHNI.jpg

https://i.imgur.com/gLRhabj.jpg

Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 12/13/20

https://i.imgur.com/Oo6CXgL.jpg

https://i.imgur.com/wUh3zVV.jpg

https://i.imgur.com/MKJXwp5.jpg

MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 12/13/20


https://i.imgur.com/Z2hpZoA.jpg

https://i.imgur.com/7vSOpQG.jpg

https://i.imgur.com/p2BC4cq.jpg

815 Cedar Ave -- 1 floor -- retail -- 12/13/20

https://i.imgur.com/1QisXTb.jpg

https://i.imgur.com/subJK74.jpg

Chef Dec 19, 2020 12:10 AM

So far all the new construction has been a similar replacement for what was there before. This is the first project that is a significant upgrade on the building that was damaged or destroyed:

Somali mall, Walgreens burned in Minneapolis riots set for $40M redevelopment
Apartments, office and retail would replace Somali mall, Walgreens on Lake Street site.
By Dee DePass Star Tribune DECEMBER 9, 2020 — 9:49PM

Plans to redevelop the Karmel Square Mall in south Minneapolis into a $40 million office, retail and apartment building have won preliminary approval from the Minneapolis Planning Commission.

The property had been a Walgreens store at 200 W. Lake St. and behind it — at 2910 Pillsbury Av. — a popular mall frequented by the Somali community. The property is believed to be the first Somali-focused mall in the country.

The Walgreens store and other surrounding structures on Lake Street were burned and sustained sprinkler damage during riots in May following the police killing of George Floyd, so the redevelopment plans are a boon to the city.

Under the plan approved by the Planning Commission Monday, the mall and Walgreens will be redeveloped into an eight-story building called the New Karmel Square.

https://www.startribune.com/somali-m...ent/573343331/

https://www.southwestjournal.com/wp-...2.04.50-PM.png

A streetview of the location before the riots:

https://www.google.com/maps/@44.9483...7i16384!8i8192

Hopefully we see more of this along Lake Street. It is an improvement on what is there now without changing the culture or the demographics of the surrounding area

MPLS_Const_Watch Dec 19, 2020 4:47 PM

Thanks for posting. It makes sense that the rebuilding that's starting first are the smaller replacement buildings, mostly from national chains, and that the more significant redevelopments are going to take longer to plan and bring to fruition. I agree that it will be exciting to see what larger projects are born out of all this. The general Lake/Nicollet area was already primed for big changes with the transit investments coming to the area and the reopening of Nicollet Ave. With the additional redevelopment opportunities forced by the unrest, I'm very hopeful that we'll see much more intense redevelopment in that area especially. And this project is a big step in that direction.

I think that rendering is a bit outdated and shows an earlier 6-story version. Here's the 8/9-story version that was approved earlier this month: (https://lims.minneapolismn.gov/downl...0W%20Lake%20St):

https://i.imgur.com/qXkgvps.jpg

MPLS_Const_Watch Jan 9, 2021 4:44 PM

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 1/9/21

https://i.imgur.com/j8FuLqb.jpg

https://i.imgur.com/egfXCo1.jpg

https://i.imgur.com/Tpk248K.jpg

Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 1/9/21

https://i.imgur.com/KpKrjEs.jpg

https://i.imgur.com/RroaTz7.jpg

https://i.imgur.com/MIVrfWd.jpg

https://i.imgur.com/NT1SQ9K.jpg

MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 1/9/21

https://i.imgur.com/WpNCgO5.jpg

https://i.imgur.com/4AVrbLh.jpg

815 Cedar Ave -- 1 floor -- retail -- 1/9/21

https://i.imgur.com/kbLTs4W.jpg

AutoZone (312 East Lake St) -- 1 floor -- retail -- 1/9/21


https://i.imgur.com/T6sNhm4.jpg

Speedway (801 West Lake St) -- gas station -- 1/9/21


https://i.imgur.com/FOTQNPp.jpg

Holiday (4601 Hiawatha Ave) -- gas station -- 1/9/21

https://i.imgur.com/2qmTCzE.jpg

https://i.imgur.com/qeEmRsC.jpg

Wendy's (2931 26th Ave S) -- 1 floor -- retail -- 1/9/21

https://i.imgur.com/ADqtO10.jpg

https://i.imgur.com/PCqsTGg.jpg

MPLS_Const_Watch Feb 3, 2021 12:54 AM

Speedway (801 West Lake St) -- gas station -- 2/2/21

https://i.imgur.com/xk60jcB.jpg

MPLS_Const_Watch Feb 7, 2021 6:37 PM

Looks like the Lake/Clinton Autozone is on track to be the first ground-up rebuild to open for business.

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments -- 2/7/21

https://i.imgur.com/P6ORBd2.jpg

https://i.imgur.com/MzEaVh2.jpg

https://i.imgur.com/9FJjrNF.jpg

Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 2/7/21

https://i.imgur.com/HN1Jzpn.jpg

https://i.imgur.com/I7IWiNL.jpg

815 Cedar Ave -- 1 floor -- retail -- 2/7/21

https://i.imgur.com/BnJoosr.jpg

https://i.imgur.com/VPpU10G.jpg

https://i.imgur.com/vLrFdCH.jpg

MaxIt Pawn (2726 East Lake St) -- 1 floor -- retail -- 2/7/21

https://i.imgur.com/P8GOUp0.jpg

https://i.imgur.com/VM4aT0Q.jpg

AutoZone (2610 East Lake St) -- 1 floor -- retail -- 2/7/21

https://i.imgur.com/Y7CP5Ww.jpg

https://i.imgur.com/iNs0vei.jpg

AutoZone (312 East Lake St) -- 1 floor -- retail -- 2/7/21

https://i.imgur.com/rcq68Ha.jpg

Wendy's (2931 26th Ave S) -- 1 floor -- retail -- 2/7/21

https://i.imgur.com/c1UTUer.jpg

https://i.imgur.com/ElRxVRR.jpg

Shell (640 East Lake St) -- gas station -- 2/7/21

https://i.imgur.com/LZoGsxP.jpg

MPLS_Const_Watch Mar 31, 2021 7:22 AM

Karmel -- apartments, retail, offices, mosque -- 9 floors -- 3/30/21

https://i.imgur.com/x8OaZkC.jpg

https://i.imgur.com/jPBS4R5.jpg

Shell (640 East Lake St) -- gas station -- 3/30/21

https://i.imgur.com/c2o9sTs.jpg

MPLS_Const_Watch Apr 8, 2021 1:25 AM

The Lake/Aldrich Speedway is now the second ground-up rebuild to be fully complete and open for business.

Karmel (200 West Lake St) -- apartments, retail, offices, mosque -- 9 floors -- 4/6/21

https://i.imgur.com/gVO3B70.jpg

https://i.imgur.com/JrMZDWd.jpg

Midtown Corner (2619 E 29th St) -- 6 floors -- apartments, retail -- 4/7/21

https://i.imgur.com/rcwqLrw.jpg

https://i.imgur.com/ZZKSOmP.jpg

https://i.imgur.com/XRVChJZ.jpg

Hi-Lake Shopping Center (2100 East Lake St) -- 1 floor - retail -- 4/7/21

https://i.imgur.com/GcRVkjl.jpg

https://i.imgur.com/spPfixt.jpg

815 Cedar Ave -- 1 floor -- retail -- 4/7/21

https://i.imgur.com/6e87V2B.jpg

https://i.imgur.com/5vTRwJW.jpg

AutoZone (2610 East Lake St) -- 1 floor -- retail -- 4/7/21

https://i.imgur.com/MPqPNUf.jpg

https://i.imgur.com/Cqxxcyd.jpg

Wendy's (2931 26th Ave S) -- 1 floor -- retail -- 4/7/21

https://i.imgur.com/f1VSNLZ.jpg

https://i.imgur.com/pw3eUOm.jpg

Holiday (4601 Hiawatha Ave) -- gas station -- 4/7/21

https://i.imgur.com/5jVekEh.jpg

https://i.imgur.com/iWn7Nb6.jpg

Speedway (801 West Lake St) -- gas station -- 4/7/21

https://i.imgur.com/6tU8i9G.jpg

MPLS_Const_Watch May 25, 2021 3:55 AM

Karmel (200 West Lake St) -- apartments, retail, offices, mosque -- 9 floors -- 5/24/21

https://i.imgur.com/cIIzZi3.jpg

MPLS_Const_Watch Jun 11, 2021 12:55 AM

Karmel (200 West Lake St) -- apartments, retail, offices, mosque -- 9 floors -- 6/10/21

https://i.imgur.com/0bZp9DO.jpg

https://i.imgur.com/BT4sVJK.jpg

112 East Lake St -- apartments & retail -- 4 floors -- 6/10/21