The Tucson streetcar is officially open, so it's coming off the list.
Phase 1 of the DC Silver Line opens tomorrow, and will come off the list then. |
Quote:
|
The Woodward Avenue Streetcar (M-1 Rail) in Detroit began construction at 12:01 AM this morning. I suspect we'll see some kind of article on this later in the morning. Because it will also include a full reconstruction of Woodward, including two bridges over I-75 and I-94, it won't be open for two years.
Downtown - Grand Circus Park http://m-1rail.com/wp-content/upload...1-Downtown.jpg M-1 Rail Midtown - Warren http://m-1rail.com/wp-content/upload...02_Midtown.jpg M-1 Rail New Center - Amtrak http://m-1rail.com/wp-content/upload...de-03-NENC.jpg M-1 Rail The Midtown rendering's a bit deceptive, as this portion of the line (a third) will be on-wire. The rest, though, will be offwire. EDIT: July 28, 2014 http://multimedia.detroitnews.com/pi...8103320_04.jpg David Coates | The Detroit News http://multimedia.detroitnews.com/pi...8103548_08.jpg David Coates | The Detroit News |
Removed DC Silver Line phase 1, Tucson streetcar, and Providence Wickford extension.
Added LA regional connector and Detroit M-1 streetcar. |
Dallas' DART Orange Line extension to DFW airport opened today, so it's off the list.
|
What is the definition of "under construction"? The LA Metro Purple line is current doing utility relocation but it is not listed under heavy rail. But the Regional connector is also under utility relocation phase but it is listed under light rail.
Sample of recent construction notices Purple line heavy rail: http://www.metro.net/projects/notice...ober-26c-2014/ Regional Connector light rail: http://www.metro.net/projects/notice...tober-17-2014/ |
Might be a little late to even mention or add to the list (and both small), but, there are two different streetcar lines that have been under construction in Dallas the last 2 years and both are due to wrap up very late this year or early next year.
MATA M-Line Olive St. extension and Urban Circulator Loop. ~1.65 miles City of Dallas/DART Downtown - North Oak Cliff line. ~1.6 miles Recent pictures of both: https://www.facebook.com/Dallas.Stre...55055631191830 https://www.facebook.com/Dallas.Stre...30518526978874 Edited in: DART LRT Blue Line South Extension to UNT-Dallas. ~2.6 miles http://dartdallas.dart.org/2014/10/0...ine-extension/ I cannot confirm, however, that anything beyond a ceremonial ground-breaking has happened. If I get a chance, I'll ride that train to the end one day and looksee for myself. |
I think the Boston Green Line Extension can finally be added back to the light rail construction list. Work has started on the Phase I widening of bridges that will carry the new line.
https://farm6.staticflickr.com/5590/...892010b0_b.jpg2014_06_30 T1 Bridge Progress, from North side of Harvard Street Bridge, looking South by MassDOT, on Flickr Quote:
|
Quote:
Quote:
|
Chicago needs a Lightrail. Period. We need to connect Navy Pier, Union Station, and Museum Campus with something other than a bus. Rahm needs to just pull the trigger. With the Lucas museum coming in (fingers crossed) and navy pier getting remodeled even more tourists will be going to museum campus and navy pier.
|
Still not adding this one to the list because... :shrug:
http://www.metro.net/projects/westside/field-work/ |
Sacramento's Green Line (starter) has been completed for a while, and the Blue Line extension is still on track to open next fall.
|
Official ground breaking ceremony for the Purple Line extension in LA is today, but the line had been under construction for about 9 months now.
http://thesource.metro.net/2014/11/0...ire-boulevard/ |
LA's Purple Line extension Phase 1 has officially broken ground today, and can be listed as under construction. Its heavy rail, and phase 1 will run 3.9 miles from Koreatown to Beverly Hills.
http://thesource.metro.net/2014/11/0...ire-boulevard/ https://lametthesource.files.wordpre...1/phasemap.jpg https://lametthesource.files.wordpre...pg?w=584&h=388 |
The Oakland Airport BART connector opened today.
|
LA's purple line wasn't on the list because at this point I'm mainly relying on you guys to tell me when to update it. Now that you've have, I've added that.
Changes I've just made:
|
Correct Cirrus. The Green Line starter segment did finish a while back and now stops at Towhship 9 in the River District. The rest of the line up though the Natomas neighborhood and to the airport has environmental and engineering documents completed (for the most part), but no funding. RT is looking for options on how best to secure funding.
|
Seattle's Sounder extension to Lakewood has been open for a little bit now.
|
The Atlanta Streetcar opens today.
|
Came into the thread to move the Atlanta streetcar down to complete, since it's now open.
After seeing Tcmetro's post about Lakewood, I checked that on the front page and discovered the Lakewood line was listed *both* in the construction and completed sections, so I removed it from the construction section. DC's H Street streetcar was tentatively scheduled to open today, but it's going to slip to January so for now it remains on the list. It will almost certainly be the next thing to come off. |