Interesting. Seems like a good project.
Loop Track Renewal Project starting this month |
Mayor, CTA privately talked about $300 million no-bid deal
Plans fell through after disclosures about poor quality work surfaced By Jon Hilkevitch and David Kidwell, Chicago Tribune reporters 8:26 a.m. CDT, April 12, 2012 The Emanuel administration and the CTA engaged in private discussions on a $300 million no-bid contract with the maker of the transit agency's new rail cars, but the talks collapsed amid disclosures about the poor quality of the company's work, the Tribune has learned. Bombardier Transportation's pitch to build and operate a South Side rail car overhaul facility on vacant city and CTA land in a CTA rail yard took off in May 2011 after Mayor Rahm Emanuel was elected, CTA officials told the newspaper. The talks over the public-private partnership continued for 10 months, "in keeping with the mayor's priority of creating jobs and generating economic development," CTA spokeswoman Molly Sullivan said. CTA lawyers had been working to justify the unusual practice of awarding such a large contract without competitive bids, the transit agency said. But the city and CTA backed away from the talks in recent weeks amid Tribune reports that disclosed defective-parts problems with Bombardier's ongoing production of 706 new rail cars under a contract that totals $1.14 billion. Rest of Article: http://www.chicagotribune.com/news/l...,5215344.story Kinda a bummer as it would have been nice to have the refurb shops in Chicago. I'm sure they'll work something out though in the long run even if they have to bid it out. In other news, they started refurbishing the Belmont Blue Line Station yesterday. Can't wait for that dingy POS to be shinny and white inside like the Logan Sqaure stop is. |
Are there any plans to electrify the La Salle Station network and merge it into the Metra Electric network.
|
CTA EVM at MED 55/56/57th St. Station
http://metrarail.com/content/dam/met...with%20CTA.pdf
Interesting announcement, especially the part about "future cooperation between sister agencies"! |
Quote:
|
Quote:
|
Quote:
|
Does UP-North share tracks with very much freight? From a functional standpoint it seems like a good candidate for electric, too.
|
Since Freight does not use the line , could they use Stradler Flirt trains?
|
Quote:
That said, Union Pacific might oppose electrification. The best candidates for electrification are the lines that Metra already owns. The Milwaukee District lines see substantial freight traffic from CP, so that poses a problem. That leaves Southwest Service, which is technically owned by NS but is used and maintained exclusively by Metra, except for a short stretch on the South Side that NS uses for yard access. |
Quote:
|
Quote:
What would be the reasons that UP itself would oppose electrification - maintenance costs and snowstorm outages? |
They might be uncooperative just because UP’s UP and likes to do things the UP way.
There is still some freight still comes down to the North/Elston area (when walking down Blackhawk I was shocked to see it pull in during the day) via the UP-NW line. If we’re lucky, the amount of freight might be trivial enough that they can reschedule it to hours when passenger trains aren’t running (or maybe even stop stop it altogether). If not—or if UP’s uncooperative in rescheduling—then it makes getting a waiver more difficult. In terms of NIMBYS, it helps that a lot of the UP-North line is elevated or trenched, and I’d say quicker deceleration and braking would be a big selling point for communities with grade crossings. You’re probably right about there still being opposition to catenary as blight, though, plus there’s be the awful “electromagnetic radiation” canard. |
Quote:
Flirts are single level EMUs. KISSs are double level EMUs. GTWs are single level DMUs. They don't make double level DMUs. GTWs are being used in Austin and will enter service later this year in Denton. Any line without freight trains can qualify for exemptions from the FRA. Often lightly used freight lines can get temporal separation waivers so non compliant FRA passenger trains can be used. The answer to your question is yes. But should they? There are FRA complaint double decker EMUs already being used in the Chicago area. Why add a new parts supply chain to the inventory? |
Because FRA compliance adds a ton of weight that has to be pushed using expensive energy. The Highliners also require high-level platforms (which I like, but the costs of building up platforms around Chicago is unlikely).
|
Quote:
I have a crazy question. Has anyone ever thought of storing electric power aboard trainsets so that overhead power lines can be omitted over certain stretches (whether just 100s of feet or over much longer stretches)? You could even have a separate "battery car" which would be 1 added railcar just as a diesel locomotive today is 1 additional railcar. The way battery technology is evolving due to the electric-car boom, maybe this could be become practicable before long. I can't think of a major impetus to invest in the technology other than deleting catenaries for urban aesthetics, though. But if we get to a point where somewhere needed electrification is forestalled for years and years by NIMBYs, maybe it could be a solution. Quote:
|
Quote:
|
^^ Various manufacturers have been developing such a technology for trams/streetcars... I know DC was considering it because of a century-old ordinance banning overhead wires anywhere in the central city. They ended up passing a bill to allow exceptions on a case-by-case basis, but never on the Mall or Pennsylania Ave.
The net emissions benefits of electrification depends on the type of power generation used. ComEd uses 58% nuclear power, so we're good on that aspect. Exelon has lobbied vehemently for cap-and-trade, so they strongly see themselves on a track towards carbon-lite or carbon-neutral. Plus, since an electric train doesn't have to lug its fuel around, it's automatically more lightweight and therefore more energy-efficient than a diesel train, regardless of whether it's loco-hauled or multiple-unit. |
Quote:
On the flipside, UP has drastically reduced its budget for tree-trimming. The fear of fallen branches was the cited reason for all the thunderstorm closures of Metra. Funny, there wouldn't have fallen branches if UP was trimming the trees properly... but a fallen tree would wreak havoc on an overhead wire system. |
Quote:
|