City Hopes to Use State Law Allowing Transit TIFs to Rebuild CTA Red Line
http://chi.streetsblog.org/2016/08/1...-cta-red-line/
Thursday August 11, 2016 Mayor Rahm Emanuel’s office has started crafting an ordinance that would activate a state law allowing the city to create “transit TIF districts” – officially called Transit Facility Improvement Areas – around four transit projects, according to the Chicago Tribune...... |
Crane was delivered tonight for Washington & Wells. The entire Loop was built 120 years ago in less time than this one station has taken just to do substructure, and without closing any streets for more than a weekend.
|
Quote:
|
Comparison Station Boardings METRA ELC/CTA RED LINE
Comparison Station Boardings Metra(2014) CTA(2016)
METRA ELECTRIC MAIN
Source: www.rtams.org DH |
Quote:
|
Quote:
|
Quote:
DH |
^I'm trying to figure out what the Geofoam stacked on the sidewalk is for. Will this station include a sledding hill?
|
Quote:
|
^ No question is too obscure for ardecila to find an answer to. Even ones that baffle Mr Downtown. Do you have access to some kind of dark web wikicitya?
(I assume this isn't your summer version of an April prank, right?) |
Hmm, was just on the Red Line between Grand and Lake and suddenly felt a huge BANG BANG every time the wheels went over one point. Hopefully not a broken rail. The driver slammed on the breaks after about the third one. Then proceeded slowly and kept grinding to a halt until we got all 8 cars past.
Wonder if they'll shut it down...too bad it's rush hour. |
Quote:
DH EDIT.....Red Line 95th/Dan Ryan-bound Subway Trains Rerouted to Elevated Tracks Service Disruption Predictions Disabled Affects Train Tracker prediction availability (What's this?) 95th-bound Red Line trains are temporarily rerouted to the elevated tracks between Fullerton and Cermak-Chinatown. Tue, Aug 16 2016 9:06 AM to TBD Wow! 2nd EDIT.....Red lines are running, probably speed is reduced in problem area. Work window anticiplated..... Red Line Upcoming Alerts Red Line Boarding Change, Delays Between Grand and Cermak-Chinatown Planned Work Predictions Disabled Affects Train Tracker prediction availability (What's this?) Wed, Aug 17 2016 - 11:00 PM to Thu, Aug 18 2016 - 4:00 AM |
Quote:
|
Quote:
|
19th Annual Transportation Symposium.....
19th Annual Transportation Symposium
http://illinoistransportationsymposium.com/ Tuesday, November 15th, 2016 Chicago Cultural Center 78 E. Washington Blvd. Chicago, IL 60602 I will be an Exhibitor there. |
Work beginning Monday on Metra Electric Line to cause delays
http://chicago.suntimes.com/news/wor...-cause-delays/
Commuters on Metra’s Electric Line should prepare for 10-minute delays and altered schedules as major work begins Monday on the line that runs from the city to the south suburbs...... |
Quote:
http://i.imgur.com/oAX36Zkl.jpg The city will be made entirely of geofoam just in time for the next big fire. |
^ With the rebar sticking out the top, those look more like insulated concrete forms. Similar foam material, but used in thin sheets as form work for a concrete pour rather than as a replacement for soil.
|
It's not quite complete but the Argyle shared street is looking really rough
|
Quote:
Hopefully it looks a lot better once all the trees are in. Right now, it already looks tired and unkept. |
All times are GMT. The time now is 5:47 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.