Quote:
|
|
Street level renderings for the new Lawrence, Argyle, Berwyn & Bryn Mawr stations:
https://www.transitchicago.com/rpm/whatsnew/ This is a pretty clean modern transit palette, nothing spectacular but the gridded rainscreen reminds me of a budget version of new metro stations in Hong Kong (https://goo.gl/maps/k9MtWndW4xPYDAkW7). And it'll probably be value-engineered down to a white glazed cement block, which I guess is okay. They need to stop using those awful "neighborhood logos" though. It's better to evoke neighborhood character with materials and forms rather than use a concocted logo that will look awful and confusing in 10 years' time. The "Edge" logo on Berwyn is the worst offender here, it even overpowers CTA's own signage and logos. |
Disappointed to see them apparently using segmented box girders for the overpasses. I love continuous box girders, as in California freeway interchanges—but the segmented ones look cheap and ugly within a year.
I realize, though, that it's a staging issue. You don't want to close an east-west street for six weeks to put up falsework for poured-in-place box girders, and dropping in precast beams requires more vertical depth and probably also requires some sort of stringers to support the tracks. Surely there's a shallow precast T- or TT-beam that would work. |
They could do something fun and give the public something like this, but since its the cta that would be asking too much:
https://www.thisiscolossal.com/wp-co...ew-640x960.jpg _ Seriously though, if you really wanted to you could spec those segmented cast girders to have a groove detail say every 6 inches or so and get that joint tolerance to match and it would look like one continuous structure. But that's all fussy and whatnot right? Proceed with the "who gives a shit it will only look like this for another hundred years" approach. |
Quote:
With a gantry they can demolish just a few hundred feet of the gravity walls (probably at the station locations) and create drop zones where the precast segments can be picked up by the gantry and then moved down along the corridor to where they are needed. https://www.transitchicago.com/asset...n_Drawings.pdf |
I haven'y looked specifically at the COVID relief bill that's with the Senate right now, but I believe I've heard of earmarks for certain transit projects, such as the BART extension to San Jose/Santa Clara here in the Bay Area. Or maybe it's intended for the next big bill that President Biden wants Congress to take up, the infrastructure bill? Anyway, I was curious if there are any Chicago transit projects either slated for an earmark in the current COVID relief bill or would have a good chance for funding in a future infrastructure bill? (of course the specifics of the bill make a difference... plus CTA is presumably just trying to survive at the moment after a year of depressed ridership)
Seems like the red line south extension would be highest on the list of possibilities for significant funding? Is there any push right now for the orange line extension to Ford City Mall? I have long been a fan of extending the brown line under Lawrence Ave from Kimball to at least Jefferson Park (and perhaps from there to O'Hare). High capacity transit connecting Union Station/Ogilvie and Mag Mile/Streeterville (e.g. this)? Should the CTA focus efforts on required studies, environmental impact reports, etc. right now in hopes of advancing them forward with any infrastructure funding that becomes available over the next few years? |
Quote:
Removed just this week thanks to Repub outcry, e.g. "Pelosi's Subway"... Probably wasn't the smartest move to try to slip it in there even if it could be justified as econ relief because any infrastructure project can be justified as a "jobs program" - much in the same way that the Repub's claim the Keystone pipe was some enormous lost jobs opportunity. Specifically with the BART extension, it really makes little difference though as the funding will just be in the infra bill later this year, which Repub's won't vote for either because... they love America so hard??? This probably should be in the SFBA transport thread... |
Quote:
|
Quote:
The only FFGA project that Chicago has right now is the RPM project on the North Side. Everything else is too undeveloped. The rub there is that the local portion of RPM is funded by a dedicated transit TIF. I think legally those funds can't be used for anything else. The upcoming transportation bill is more open-ended and could potentially benefit Chicago projects. However, our city will be harmed by the fact that we really don't have anything queued up. The cities that have been most successful with expansions of transit or roads are the ones who have developed plans ready to dust off, which in turn requires a dedicated source of funding for planning/engineering and politicians who will go to bat for transit. A dotted line on a map doesn't cut it. Here's a few projects that we should expect to move forward. This is already a large and very costly list, so I wouldn't expect to see any big surprises.
* = This was actually the wrinkle with the BART project because it was in a special fast-track program and didn't have an FFGA, so it had to be removed under the Senate rules for reconciliation. |
Metra should have a pretty well baked set of proposals for an A2 bridge by now that could take money. They also could also use a pile of cash to buy more Chargers. Would like to see a Rock Island electrification too.
|
^ I don't think anything for A-2 is baked unfortunately and the Rock Island thing is just a wishlist item at this point.
However, one thing I'd like to see out of a "climate focused" transpo bill is a new funding stream for electrification covering both buses and rail transit (and ideally excluding any existing traction systems, except to extend electrification). The availability of funding will persuade legacy systems to electrify. Right now even the East Coast systems have given up on extending electrification. And since the money could also be used for buses, that lets Sunbelt cities get in the game too with battery bus systems or trolleybuses. Caltrain managed to electrify, but this was under unique circumstances (US' strongest regional economy, the ancient promise to voters to send BART up the peninsula, etc). I don't see other US cities rushing to electrify unless something changes, like a new well-endowed Federal program... |
Quote:
|
Quote:
Per https://www.transit.dot.gov/funding/.../about-program Discretionary & Competitive Federal Grant Program Roughly $2.3 billion appropriated each year Funds light rail, heavy rail, commuter rail, streetcar, and bus rapid transit projects Eligible Projects New Starts Total project cost is equal to or greater than $300 million or total New Starts funding sought equals or exceeds $100 million New fixed guideway system (light rail, commuter rail etc.) Extension to existing system Fixed guideway BRT system Small Starts Total project cost is less than $300 million and total Small Starts funding sought is less than $100 million New fixed guideway systems (light rail, commuter rail etc.) Extension to existing system Fixed guideway BRT system Corridor-based BRT system Core Capacity Substantial corridor-based investment in existing fixed guideway system Project must: Be located in a corridor that is at or over capacity or will be in five years Increase capacity by 10% "not include project elements designated to maintain a state of good repair" Approval Process New Starts 1) FTA approval: Project Development Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan 2) FTA evaluation, rating, and approval: Engineering Gain commitments of all non-5309 funding Complete sufficient engineering and design 3) FTA evaluation, rating, and approval: Full Funding Grant Agreement Construction Small Starts 1) FTA Approval: Project Development Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into fiscally constrained long range transportation plan Gain commitments of all non-5309 funding Complete sufficient engineering and design 2) FTA evaluation, rating, and approval: Construction Grant Agreement Construction Core Capacity 1) FTA Approval: Project Development Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan 2) FTA evaluation, rating, and approval: Engineering Gain commitments of all non-5309 funding Complete sufficient engineering and design 3) FTA evaluation, rating, and approval: Full Funding Grant Agreement Construction FAST Evaluation and Rating Criteria New and Small Starts Project Justification: mobility environmental benefits congestion relief economic development cost effectiveness (cost per trip) land use Core Capacity Same as New and Small Starts, except replace land use with capacity needs of the corridor All Local financial commitment: acceptable degree of local financial commitment including evidence of stable and dependable financing sources Funding Recommendations FTA’s decision to recommend a project for funding in the President’s Budget is driven by a number of factors, including: the “readiness” of the project for capital funding the project’s overall rating geographic equity the amount of available funds versus the number and size of the projects in the pipeline Receipt of Construction Funding To receive a construction grant agreement a project must: Complete the Planning, Project Development, and Environmental Review Processes Meet Project Readiness Requirements (technical capacity, firm and final cost estimate, all funding committed) Receive a “medium” or higher overall rating Meet all other federal requirements My thoughts The entire process for New and Small Starts takes nearly a decade to complete just to reach the Full Funding Grant Agreement stage. The Full Funding Grant Agreement is the last step in the process before construction can even begin. It is the point where the project is construction ready. Core Capacity projects are hard to rank high on the evaluations mainly because state of good repair associated costs are eliminated from this grant program. The FTA expects the local transit agencies to maintain their fixed guideways with their own money. If you can't take care of what you have, why give you more of it? If what you have is in good shape but is no longer able to meet the demand in traffic, then core capacity grants can be gained. Making station platforms longer, adding platforms to stations, adding more stations, adding more interlockings, etc. Not adding brand new transit lines, nor rebuilding a station in poor shape, that is not what this program is for. With more money being given to these programs, more projects will be allowed to move through the entire process faster. Local match percentages can be lower only because more projects with lower rankings will get funded. Transit agencies paying 10% more of the capital costs to get higher rankings above other projects will not be as common when your project will probably get funded at the 10% lower match anyways. |
Quote:
|
I really don't understand the hard-on that so many people get for electrification of suburban rail.
It's not really that much greener. Diesel-electric locomotives, of course, are electric locomotives that carry their generators around with them. The inefficiency of having many small generators is not dramatically different from the transmission losses suffered in sending current many miles from a central generating station. Yes, the juice can be generated by wind or solar, but surely trains aren't the lowest-hanging fruit for carbon-neutrality. Get back to me when half of our heating and aircon is done by renewables. Or even half of the auto mileage. If particulate emissions is your worry, lots of other things—natural gas or turbine prime movers, regenerative braking—could be done for a fraction of the cost. It simply doesn't save that much time in acceleration. UP-North takes 36 minutes to make 16 stops along 14.7 miles of track (Main St Evanston to Fort Sheridan). The much faster-accelerating Metra Electric, featuring high platforms for faster loading, takes 31 minutes to make 16 stops along 14 miles of track (87th St to Flossmoor). When you're only running one or two trains an hour, those five minutes are just not that meaningful. Even if you want the acceleration possible with big electric traction motors, it's not especially important whether you're carrying the generator around with you or leaving it miles away in Dresden. Onboard batteries and regenerative braking—or even just a higher idle rate for the prime mover— can give you more tractive effort to the motors without the expense of stringing and maintaining miles of catenary. It costs a bloody fortune to string and maintain all those wires. Ontario's study of electrifying the Toronto suburban network found a payback period—even with cheap government borrowing—of a century, longer than the useful life of the asset. Change my mind. |
Quote:
Quote:
|
Quote:
I never understood why MBTA was not already using electric locomotives on the Providence line? It was already owned the the State, and already electrified. All MBTA basically needed was buying or leasing some electric locomotives, and electrifying their yards. I guess politics, having electric lines from North Station also, was the problem all along. Back to making it easier to qualify for some Federal matching funds, maybe MBTA should look at converting the northern lines to light rail or metro lines, opening up the possibilities of getting new starts grants? It's not like they do not already have light rail or metro lines. ;) |
Quote:
Running a whole bunch of trains off peak so that we can watch empty rail cars go in and out of downtown are probably not the best use of Metra’s limited resources, especially in the Covid “I work from home and I like it that way” world. Electrifying Metra is not a priority nor should it be. At least for a very long time. |
Quote:
I am going to so enjoy everybody who thinks they're going to keep working from home being made to drag their asses in every day again. There is going to be such a huge correction that it's going to induce whiplash. |