Quote:
I'd Love to see the cheaper extensions like this around the system. Kinda like ebart except to run to a couple specific places. Well, if that's not too tacky! |
Charlotte has received approval to enter project development for phase 2 of CityLYNX Gold Line streetcar. In addition to the streetcar line, the city's second light rail line (Blue line extension) is also currently under construction.
https://pbs.twimg.com/media/BhZ-_6kIIAAOJRP.jpg Source Blue line extension utility work underway: https://scontent-b.xx.fbcdn.net/hpho...39736194_o.jpg https://scontent-a.xx.fbcdn.net/hpho...17280405_o.jpg https://fbcdn-sphotos-f-a.akamaihd.n...93314288_o.jpg Park and ride: https://scontent-b.xx.fbcdn.net/hpho...17889225_o.jpg Source |
Project development isn't construction, but I'll add the Blue Line the next time I update the front page.
|
Quote:
|
|
Added to the front page:
|
Orlando SunRail Phase I is now operational as of Thursday.
Orlando SunRail Phase II - 30 miles (5 stations) - pre-construction (construction expected to begin in late Q4 2014) |
Moved Orlando's Sunrail commuter rail off the list, since it officially opened for service.
I'll add phase 2 when it actually begins construction. |
Moved Houston North LRT to the completed section.
|
Thanks for making and maintaining this list, Cirrus.
|
You can remove everything from SLC as frontrunner south opened in 2012 and the airport and draper lines opened last year
|
OK thanks. Moved all the SLC stuff into the completed section.
Also added the Kansas City streetcar to the construction list, as it broke ground in May. Will have to do another update soon. There will be a bunch of openings this summer. Next one is probably the Minneapolis / Saint Paul central light rail, which should be this month. DC Silver Line and Tucson streetcar probably in late July. |
Quote:
SMART + eBART (10 miles) = 48 miles. Again, thank you for maintaining this list. :cheers: |
The Minneapolis - St Paul central corridor Green Line is running as of today.
http://www.startribune.com/local/stpaul/263103591.html |
^Awesome, hope to see photos soon!
|
Minneapolis moved to complete, and 32 miles reduced from the SMART/eBART line.
|
LA Purple line
Should LA's Purple line extension be included?
"This another step forward for the 3.9-mile Purple Line Extension project and puts the subway addition closer to construction. Utility relocations and some other prep work have are already underway..." http://thesource.metro.net/2014/07/0...s-first-phase/ |
Quote:
http://thesource.metro.net/2014/07/0...ector-project/ |
Quote:
Expo Line Phase 2: 6.6 miles Gold Line Foothill Extension (Phase 2A): 11 miles Crenshaw Line/LAX Connector: 8.5 miles Downtown Regional Connector: 1.9 miles for a total of 28 miles of (light) rail currently under construction. For the Purple Line/Westside Subway they've only dug the exploratory shaft so far so I don't think we can call it officially under construction yet. It will be pretty cool when they finally do start though. From what I understand, there's never been a time in Los Angeles' history when 5 rail projects were under construction simultaneously before. |
Quote:
|
All times are GMT. The time now is 7:32 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.