skyscraper Aug 11, 2017 10:43 PM

Quote:

Originally Posted by Kumdogmillionaire (Post 7890516)
Well the designs have already changed multiple times, so it seems very possible to me that the height would change over time. All depends on when these 9 months were.

last year; my last day was the monday before thanksgiving.
I am sure the design has changed since then, but the zoning determination would not have because Phase One is included in it.

harryc Aug 13, 2017 4:45 PM

Aug 12


Parking Palooza - 8 floors and counting

KWILLSKYLINE Aug 14, 2017 2:02 PM

It's so weird leaving the parking garage for later. Is this a common thing that I just haven't noticed? Does anybody know at what point they will start building it? Will they wait for complete T/O or somewhere in the middle? Either way, very cool project.

SteelMonkey Aug 14, 2017 2:36 PM

Quote:

Originally Posted by KWILLSKYLINE (Post 7892393)
It's so weird leaving the parking garage for later. Is this a common thing that I just haven't noticed? Does anybody know at what point they will start building it? Will they wait for complete T/O or somewhere in the middle? Either way, very cool project.


Dont know for a fact but with this design it kinda made sense to add it later. Def sped up the process with the base. Original plans were to install a 2nd crane by Oct to begin work on the structure.

intrepidDesign Aug 15, 2017 4:40 PM

I was down in this area yesterday and man o man is this thing going to command a presence. All the picture and updates are amazing, but this building feels so much larger in person. It's only what, 11, 12 stories off the ground and it already feels substantial, at it's full height it's going to soar, thinking about it's big brother makes my head spin. We're getting a gem here.

vexxed82 Aug 15, 2017 7:03 PM

Can anyone explain the lighter concrete near what will eventually be the feet of the parking ramps? Almost look like temporary patches.

Parking Palooza - 8 floors and counting
[/QUOTE]

chrisvfr800i Aug 15, 2017 9:27 PM

Quote:

Originally Posted by vexxed82 (Post 7893668)
Can anyone explain the lighter concrete near what will eventually be the feet of the parking ramps? Almost look like temporary patches.

Parking Palooza - 8 floors and counting

[/QUOTE]

I was gonna say it's puddling of the higher strength column/wall concrete in the slab, but I'm not so sure.

KWILLSKYLINE Aug 15, 2017 10:29 PM

I wonder if it's less dense or something to make it easier to maneuver the rebar at a different time.

harryc Aug 15, 2017 11:24 PM

Quote:

Originally Posted by KWILLSKYLINE (Post 7893938)
I wonder if it's less dense or something to make it easier to maneuver the rebar at a different time.

My guess - and only a guess - is that the concrete has been dressed (either ground or grouted) at the point the forms were for the angled ramp. You can see a similar discoloration on the blank wall.

gebs Aug 17, 2017 3:16 PM

View from the amenity deck of 1250 S Michigan

http://i.imgur.com/NbSBwrKh.jpg

maru2501 Aug 17, 2017 4:25 PM

moving quickly

Swerd Aug 19, 2017 1:41 PM

Quote:

Originally Posted by KWILLSKYLINE (Post 7892393)
It's so weird leaving the parking garage for later. Is this a common thing that I just haven't noticed? Does anybody know at what point they will start building it? Will they wait for complete T/O or somewhere in the middle? Either way, very cool project.

The second tower crane will go up early September after the existing tower crane jumped.

KWILLSKYLINE Aug 20, 2017 12:14 AM

Thanks. Cant wait for a second crane. Any chance that crane remains for tower 4?

LouisVanDerWright Aug 20, 2017 5:35 AM

Quote:

Originally Posted by KWILLSKYLINE (Post 7898288)
Thanks. Cant wait for a second crane. Any chance that crane remains for tower 4?

The chance of that is zero. If they build tower 4 it will be a totally separate project. There is no scenario in which keeping a crane standing on a neighboring parcel is more economical than just assembling a fresh one exactly where you need it. They put these things up in a weekend, assembly is not the defining cost, day to day rent for the equipment is. If the two projects are even staggered by a few weeks it's definitely cheaper just to assemble a new crane exactly where you need it than to leave the previous one standing and pay weeks of extra rent.

BVictor1 Aug 24, 2017 5:46 AM

08/23/17

https://uniim1.shutterfly.com/ng/ser...553149/enhance

https://uniim1.shutterfly.com/ng/ser...553161/enhance

https://uniim1.shutterfly.com/ng/ser...553369/enhance

Notyrview Aug 24, 2017 2:19 PM

Whoa it's taking off

BVictor1 Aug 26, 2017 1:03 AM

08/25/17

https://uniim1.shutterfly.com/ng/ser...707608/enhance

https://uniim1.shutterfly.com/ng/ser...707488/enhance

https://uniim1.shutterfly.com/ng/ser...707456/enhance

https://uniim1.shutterfly.com/ng/ser...707245/enhance

https://uniim1.shutterfly.com/ng/ser...707273/enhance

BrandonJXN Aug 26, 2017 12:21 PM

This thing is rising rather quickly.

KWILLSKYLINE Aug 26, 2017 5:03 PM

Tower four? can you please start in this cycle?

Le Baron Aug 29, 2017 11:16 AM

the west side is about capped off and ready for the set back