![]() |
Quote:
|
Quote:
|
Quote:
Guys, a big part of why our L tracks have such a short life is because 90% of the system is above ground, on century-old viaducts, in Chicago's harsh winter climate. In other cities, like New York, DC, Paris, London, etc. where a greater amount of the system is underground, the track life is much longer because it isn't exposed to weather. |
Quote:
|
New track, platform debut today at Fullerton L stop
http://www.suntimes.com/news/metro/2...rail29.article
New track, platform debut today at Fullerton L stop January 29, 2007 BY MONIFA THOMAS Transportation Reporter Northbound Brown and Purple Line Express trains will begin using a new track and station platform at Fullerton today. The new track was built in preparation for this spring, when the CTA takes one of its four tracks at Fullerton and Belmont out of service for the next two years as part of the agency's Brown Line expansion project. At worst, travel times on the Red, Brown and Purple Lines could double once three-tracking begins, the CTA has said. Elsewhere on the Brown Line, there will be a temporary entrance for the Sedgwick stop at Hudson Avenue, about one block west from the existing one. Belmont, Fullerton and Sedgwick are among 18 Brown Line stations being rebuilt, so they can accommodate riders with disabilities and longer trains. mjmjthomas@suntimes.com |
I don't know that putting a lot of the elevated sections of track underground would be politically smart considering the el is something many in the city have an attachment to, but then again, a lot of people don't like the noisiness of it either. Many of the outer elevated sections of track don't get the train traffic to warrant putting them underground anyway.
A new underground loop (Clinton Street Subway) is an absolute must for the CTA... I think it's even more important than the circle line considering this mile-long subway segment alone would greatly increase capacity and operation flexibility on the current blue line routes and do what the circle line also intends to do: connect easily to Metra lines. |
Quote:
This would add about 3/4 mile of additional tunnel, so it would certainly cost more, so maybe that's why, but then again this would open up a couple more neighborhoods to TOD as well and help Metra run more efficiently. Anyway. Just talkin'. |
Quote:
http://wilsnodgrass.smugmug.com/photos/126481414-M.jpg http://wilsnodgrass.smugmug.com/photos/126481422-M.jpg http://wilsnodgrass.smugmug.com/photos/126481401-M.jpg http://wilsnodgrass.smugmug.com/photos/126481397-M.jpg Looking North crossing over to new platform http://wilsnodgrass.smugmug.com/photos/126481388-M.jpg Platform http://wilsnodgrass.smugmug.com/photos/126481366-M.jpg http://wilsnodgrass.smugmug.com/photos/126481359-M.jpg http://wilsnodgrass.smugmug.com/photos/126481354-L.jpg |
^ I saw that last night on the way home. Kinda caught me (and everyone else) off guard a little. It's funny when a Brown and Red get into that station at the same time because everyone runs for those little walkways and pretty much has a head on collision with the other group.
I also noticed how SMOOTH the new track was. It's only about a block long, but it was much quieter and smoother than the rest of the elevated. It really made me wish replacing the track was part of this new revamp as well. At least on the main line section. I assume they'll extend the new platform out towards where the old northbound brown line tracks are. The stairs come up RIGHT at the edge of the new platform, clearly a northbound red line couldn't open it's doors right there when the platform is in full use. Does anyone know how that's going to work? Move the brown line to the east and start service on the new platform (already done) Extend the new platform to the west over the old northbound brown line tracks. Finish new tracks for northbound red line service Tear down the old platform Do the whole thing over again for the southbound platform/s\ ? |
Quote:
We are seeing 2/3 of the Plat form. The Remaining 3rd will be created over the track between the two platforms. So the new red line will be approx where the old platform now is. I wish CTA could have had a little forth thought and created a 5th rail at both Belmont and Fullerton so Express trains could be run or when there were emergencies at those two major stations trains could bi-pass them. But I think CTA holding up 10,000's a people in those cases is smarter. |
^ Cool! It's interesting how the auto-oriented suburbia (Schaumburg and Arlington Heights here, much of the LA area, etc.), after 50 years, are now trying to move towards more compact and transit-oriented development.
|
I'd like to be more hopeful of Schaumburg's plans, but I'm envisioning Streets of Woodfield II with a train station. http://images.skyscraperpage.com/ima...ilies/yuck.gif
I hope I'm wrong. They should hire Optima to build a cluster of sleek condo and apartment towers in the plan. |
Quote:
|
^Agreed. Times 10. Or More.
|
Quote:
For anyone interested, some preliminary land-use planning: http://img398.imageshack.us/img398/6...aumstarfa1.jpg I go around this area pretty frequently. The development to the SW of the station could actually happen. There's a 3-building office park there right now, but a small street grid could easily be overlaid onto the parking lot and the new blocks filled with buildings. The larger development area to the NE is filled with a ton of low-rent, 2-story 70s apartments. I'm not sure how easy it will be to get those guys to leave. |
^They plan on tearing down the Walden Apts? That seams pretty stupid considering how many units exist there. It would much more sustainable to alter the layout a bit and fill in some of the open green space. It would be nice if they could get the new hotel to rid itself of that massive parking lot, and convert it to garage parking inside a few new high-rises.
|
Quote:
Quote:
Compare long haul trucking to freight trains. One pays for its right of way, and the other has the government pay for it. This makes the more innefficient trucking industry over used. End all subsidies, and the most efficient will win out. This will mean an end to the Department of Transportation. States will no longer be able to maintain and build the limited access highways, so they will have to sell them off. This could be used to pay off a lot of government debt. Many more rail lines would likely be built to run for profit all over the city and surounding areas. The existing rail lines would likely run much better and without tax money. Who would buy this stuff? Foreigners who have lots of $US from all the stuff they have been exporting to the US. What else can they do with all those dollars? Some already have been buying (or trying to buy) major assets in the US. The city of Chicago already received $1.83 billion for a 99 year lease on the Skyway (part of I-90). Maybe some of the other major expressways could be sold off some day. |
Quote:
The situation for roads is not unique however. The Dept of Trans. subsidizes virtually every form of transportation, whether through federally funded airport construction, amtrak subsidies, light rail, or port oversight. Mobility in generally seen as a public good and subsidies tend to benefit the working class who would otherwise not be able to afford to travel. |
Quote:
The government both Federal and States should work with the railroads to improve this infrastructure. One of the big ticket items in the recent transportation bill was trying to debottleneck the Chicago rail network. |
Could someone please post the CRAINS Jan 24th Editorial on CTA! It is so great to have a business coming to the aid of over throwing Krusie and waking Daley up!
|
All times are GMT. The time now is 9:26 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.