![]() |
What a hulking beast
|
Wow. . . This thing is only about 1/4 of the way up.
|
And to think this the smaller of the two brothers!
I still think it looks better with the crown. |
^The first setback along Indiana isn't until about the 26th floor.
|
Keep on chugging little man. At the fast rate their building this thing you would think its already sold out and their making plans to start number2. Speaking of which, thats going to be some slim quarters to work with for staging and equipment storage.
|
Quote:
Crescent Heights also owns the land to the southeast of this lot and can use that for staging. |
|
Did they forget to order the glass? Starting to look like Wolf Point West... structure goes up real quick using tables, but no glass following the structure.
|
|
|
When finished i think im going to love the contrast between OGP and these two!
Keep them photos coming...... |
Dec 8
![]() ![]() ![]() ![]() ![]() |
|
This thing is going to be huge. It's going to destroy the South Loop rental market when it delivers, especially since that would be pretty much simultaneous with the one on Michigan.
|
^ this project, SoMi, and 1136 s Wabash will deliver ~1600 units in the immediate area. Roosevelt ave will definitely feel more lively after all of these developments come online.
|
Quote:
|
Quote:
|
Quote:
|
Speaking of somi... How sick would spertus institute be if it were somi's height.
|
Quote:
http://www.tishmanspeyer.com/sites/d...%20%282%29.png |
^ 130 N Franklin is the long shot project I'm really hoping materializes in this boom. Probably pretty unlikely though with all the new office space planned for and currently being added to the market.
|
December 20, 2017
![]() |
Dec 20
![]() ![]() ![]() ![]() ![]() |
|
Oh sick, the pool is cantilevered out over the edge of the building. Very sexy.
|
That Indiana elevation is massive. Going to be cool when it is enclosed if they ever decide to order the glass!
|
Quote:
:yes: |
Quote:
|
I wonder if the extreme cold has any effect on the concrete and does it take longer to cure and if so how much slower or faster does construction move?
|
Someone might need to clarify, but i’m pretty sure it doesn’t matter. I remember us talking about it when they poured Trump bc surprise it was barbarically cold then too.
|
Quote:
|
Quote:
However, the frigid temperatures of the last 2 days have effectively shut down concrete operations across the city. The men don't want to work in subzero wind chills. |
Quote:
Also, 1411 S Michigan: ~200 units delivering in 2018..... |
[QUOTE=LouisVanDerWright;8029516]Oh sick, the pool is cantilevered out over the edge of the building. Very sexy.[/QUOTE
That is a nice little surprise.... |
Quote:
|
Wow, Sam is back? It's a Festivus miracle.
|
Looking at page 1,Is that a blow hole floor at around the 50th floor much like Vista is using?
Thnx in advance... |
Quote:
Floors 49-50 are amenities floors. That corner will be open space with a fire pit. |
A few more...
12/29/17 https://uniim1.shutterfly.com/ng/ser...620197/enhance https://uniim1.shutterfly.com/ng/ser...620182/enhance https://uniim1.shutterfly.com/ng/ser...618916/enhance Approaching the first setback along the eastern flank. Another two or so floor to go before that mark is met. https://uniim1.shutterfly.com/ng/ser...618792/enhance https://uniim1.shutterfly.com/ng/ser...618790/enhance https://uniim1.shutterfly.com/ng/ser...618775/enhance |
Damn I love this building. Every building in this city should be square and bulky like this beauty.
|
Looks to be about a quarter of the way up - this thing is going to be really big especially if the 2nd tower is built.
|
Quote:
Finally something for the rest of us! 😉 |
Quote:
We’ve definitely shared some sharply differing aesthetic assessments over the years, but I’ve very rarely agreed with anything ever so much as this..... |
|
Quote:
Oh, very cool....did’t realize this one would have amenity floors that high....smart move by Crescent Heights....views will be killer and a draw for prospective tenants.... |
Quote:
|
Jan 1
![]() ![]() ![]() |
Glass soon?
|
How many days/weeks does it take for a floor to be completed? Any rough estimate on when this tower will top out?
|
All times are GMT. The time now is 2:36 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.