![]() |
Quote:
|
Feb 20
![]() The hole is filled with water - sometimes clay laden water - to help keep the sides from caving in before the sleeve is driven down. ![]() ![]() ![]() Spinning off the soil. ![]() |
February 21, 2017
![]() ![]() ![]() ![]() ![]() ![]() |
What do they do with all that clay? Is it trucked off somewhere? Used for anything?
In the Quad Cities there's an artist who makes knick knacks out of Mississippi River clay (ibloom.com). I'm curious if good clay like that is going anywhere interesting. With all the Chicago construction, that is a lot of clay being mined. |
Quote:
|
I have it on good authority that Phase 1 will not have more than 800 units in it, so whatever source had it at 900 was incorrect. When I worked on it, the number was 792 so that is consistent with my last first hand information.
|
March 8, 2017
![]() |
Seems there was quite a large pour here over the weekend. Image from http://www.sloopin.com
https://1.bp.blogspot.com/-IPpXCdS39...0/concrete.jpg |
Quote:
I assume artist-grade clays are probably mined for that purpose and kept free of impurities, not dredged up as spoil from a construction site... although artists are certainly free to get their clay from the bottom of a caisson if they wish... :shrug: |
Quote:
|
That's a wrap on the caissons.
03/17/17 https://im1.shutterfly.com/media/47a...D720/ry%3D480/ https://im1.shutterfly.com/media/47a...D720/ry%3D480/ https://im1.shutterfly.com/media/47a...D720/ry%3D480/ |
Quote:
Who's the general contractor? It will be great to see some vertical structure rising here soon! |
Quote:
McHugh is the GC. They have permits for the first 12-levels and for the tower crane. |
It's sheeting time...
03/20/17 https://im1.shutterfly.com/media/47a...D720/ry%3D480/ https://im1.shutterfly.com/media/47a...D720/ry%3D480/ https://im1.shutterfly.com/media/47a...D720/ry%3D480/ Rakers https://im1.shutterfly.com/media/47a...D720/ry%3D480/ https://im1.shutterfly.com/media/47a...D720/ry%3D480/ |
Awesome. About a month till crane gets installed?
|
Quote:
|
Quote:
An altogether silly thing to tell someone when in fact there very much is a - rather precise - timeline on it.... |
^^^ Yeah, but do project managers for private projects publish their schedules? And are those fixed in stone? The PM may have a date on his calendar for when the crane gets installed, but we don't have it.
|
Quote:
|
All times are GMT. The time now is 11:18 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.