![]() |
Quote:
|
Quote:
|
Just heard last week that a high end bar is going into the basement of Orpheum Lofts and will include the former bank vault from when the building was still Phoenix Tirle and Trust and then Wells Fargo. The investors also own The Lamb in London. Planned opening in three months. Supposedly already got their liquor license, although I can't remember seeing a public hearing sign. Perhaps someone with more knowledge than me can dig that info up?
|
Also heard rumor, definitely just rumor, of a Yardhouse going into the spot formerly occupied by Stoudamire's and Lucky Break in the Collier center.
Anyone heard the same? |
Quote:
|
http://www.bizjournals.com/phoenix/n...omes-ncaa.html
Quote:
|
Quote:
With this news, it seems even more obvious to me that a Westside LRT extension should start at 19th/Camelback, travel West on Camelback to 35th Ave. North on 35th Ave to Glendale, and then West on Glendale to Westgate. Getting Metro connection to a school that'll soon have 15K students on campus, w a/ 5K seat arena/event center just make too damned much sense not to happen. E: VVVV Awesome! Bob Graham/Motley Design are awesome. |
|
Does anyone know whats going on at 44th St and Indian School? The southwest corner is being demolished.
http://www.facebook.com/Apache.Redevelopment |
FINALLY!!!!! I can't recall what is going in, but it sure is time to take that run down thing - down!!!!!!
|
Is it just the circle k that's being torn down or more?
|
Quote:
|
Quote:
|
I went by there yesterday and the Circle K was open for business. The apartments behind it have been slated for demo for some time now so if the circle k is going along with it, this will be one large project going in there. I just figured the apartments were being replaced.
Also in the same neighborhood, there is some very speedy desctructo/constructo going on at 36th and Campbell, and I'm assuming it will be apartments as well. |
Quote:
http://www.facebook.com/Apache.Redevelopment |
Quote:
|
Condo Redevelopment at 11th Ave and McDowell
Windows are installed in all the buildings, including the one with fire damage. It looks like work on the inside is starting. The contractors are over there all the time, including Thanksgiving Day. I'm surprised I was able to get pics without people there this morning.
http://i48.tinypic.com/2cp51y0.jpg http://i50.tinypic.com/2q9gyrq.jpg http://i48.tinypic.com/zldcsw.jpg http://i47.tinypic.com/28a7uvp.jpg |
Quote:
|
Quote:
|
Quote:
|
All times are GMT. The time now is 7:41 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2023, vBulletin Solutions, Inc.