Winnipeg | 300 Saint Mary Avenue | 14F | Mixed-use Apartments
Location: 300 St Mary Avenue, Winnipeg, MB
Developer: Donmar Properties Contractor: Akman Construction Architect: NumberTEN Media: https://www.winnipegfreepress.com/bu.../on-the-rise-2
https://i.postimg.cc/MpsVCvTW/694-CD...B890306945.png https://i.postimg.cc/26d6fKw4/A87949...658234-F27.jpg ]https://i.postimg.cc/CKTSL4dJ/33-BD6...AEB85-C992.jpg https://i.postimg.cc/brywHq1z/3-C5-E...-DDD5-ECD4.jpg |
thats gonna be some sweet brick work :tup:
|
I quite like this one. Will get to watch it rise now that I'm working downtown again.
|
Quote:
|
precast in the middle is probably going to be darker now instead of white.
https://i.postimg.cc/qMZsPqSz/DSM-Rain-dark.jpg |
Im actually liking this even more as time goes on, such a classy design
|
Quote:
|
Quote:
|
TV only .41 bike spots per person?!?
|
^ ha ha. That’s huge compared to what normally gets built. Has a nice big bike room right off the main lobby to have easy access in and out as well as visibility from the security desk. A bike maintenance area with tools, wash, and a stand is part of that room.
|
Any update on the lot across from this?
|
|
Nice to see the progress, thanks for the pictures!
|
I can't believe they are going to/can build the building with that crane.
|
That crane can have an extension added to it for higher height once it caps out, to a limit of course. Or there are bigger crawlers available that can go up to 400’, they had a couple at the Keeyask hydro dam.
|
it seemed suspicious when they used a crawler for the spot at east village.. they got 'er done but not without a few glitches if we can all recall.
|
|
Thanks, Unbending
I noticed the other data the crawler crane had been folded up, and it looks totally absent now. I guess they're done with the parkade pre-cast |
Lovely building. Please send one to Saskatoon.
|
Quote:
|