SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Completed Project Threads Archive (https://skyscraperpage.com/forum/forumdisplay.php?f=348)
-   -   CHICAGO | NEMA Chicago | 896 FT | 81 FLOORS (https://skyscraperpage.com/forum/showthread.php?t=218570)

Kumdogmillionaire Mar 27, 2018 5:13 PM

Quote:

Originally Posted by gebs (Post 8134341)
I take the best shots, tremendous shots, like you wouldn't believe, most people don't know this, but these pictures, and believe me, pictures like this, we're going to win, tremendous.

... but you're right, this was from the 60th-floor amenity room. I believe there were ten more floors above me.

That was a pretty solid impression :haha:

Yeah, including mechanical the building has 73 floors, so pretty much. She's a big gal

The Best Forumer Mar 27, 2018 6:10 PM

kind of bland for this town... but it could be worse.

donnie Mar 27, 2018 6:32 PM

Quote:

Originally Posted by The Best Forumer (Post 8134740)
kind of bland for this town... but it could be worse.

Let's see her her topped out or with some glass before we judge shall we!

:tup:

LouisVanDerWright Mar 28, 2018 1:07 AM

Quote:

Originally Posted by The Best Forumer (Post 8134740)
kind of bland for this town... but it could be worse.

Bland like the Sears Tower? Ok dude, you are the only thing more square than this building...

Flaccer05 Mar 31, 2018 2:42 PM

https://i.imgur.com/HtZm5ROh.jpg

https://i.imgur.com/hKMKJAVh.jpg

https://i.imgur.com/fZrsyD4h.jpg

Freefall Mar 31, 2018 5:29 PM

When do you think we'll start seeing some glass samples?

left of center Mar 31, 2018 8:14 PM

^ Supposedly the glass is delayed by the manufacturer. Not sure exactly when they will start seeing it being delivered. I think someone in this thread mentioned later on in April potentially?

Bombardier Mar 31, 2018 8:36 PM

^ Yes, the glass is supposed to be coming in April and the glass contractor is going to start 2 crews (one on a lower floor and one part way up).

And it sounds like the Vista team has still not been able to pass the performance mockup which is why there are only slab edge covers installed and no glass panels.

KWillChicago Mar 31, 2018 11:05 PM

How far is the manufacturer from chicago.? With the size of wanda and this I would think it would be economically more convenient to use an in-city company. Either way cant wait for this one to start getting wrapped with glass.

Bombardier Mar 31, 2018 11:23 PM

Oldcastle in Wausau, Wisconsin is fabricating OGP. Efco is fabricating Vista. I'm not sure where the Efco fabrication plant is.

pip Apr 1, 2018 1:06 AM

What's that, 14 15 stories of a parking podium?

kolchak Apr 3, 2018 3:04 AM

Quote:

Originally Posted by pip (Post 8139360)
What's that, 14 15 stories of a parking podium?

Not a podium. Was constructed separate from the residential portion which fronts it on two sides with units going to street level. The fourth side will meet the east side of the adjoining building when it is built whatever the design.

BVictor1 Apr 6, 2018 7:55 AM

March in review...

03/07/18

https://uniim1.shutterfly.com/ng/ser...000321/enhance

https://uniim1.shutterfly.com/ng/ser...988148/enhance

https://uniim1.shutterfly.com/ng/ser...988179/enhance

https://uniim1.shutterfly.com/ng/ser...988074/enhance


03/13/18

https://uniim1.shutterfly.com/ng/ser...987984/enhance

https://uniim1.shutterfly.com/ng/ser...987971/enhance


03/18/18

https://uniim1.shutterfly.com/ng/ser...995192/enhance


03/19/18
https://uniim1.shutterfly.com/ng/ser...998226/enhance
https://uniim1.shutterfly.com/ng/ser...995227/enhance

https://uniim1.shutterfly.com/ng/ser...996705/enhance


03/22/18

https://uniim1.shutterfly.com/ng/ser...997259/enhance


03/23/18

https://uniim1.shutterfly.com/ng/ser...998226/enhance

KWillChicago Apr 6, 2018 10:14 AM

Great set! Timeline guess when this will pass the roof of OMPW? Mid June-ish?

left of center Apr 6, 2018 9:12 PM

3 floors added between 3/7 to 3/23, that works out to around a floor every 5 days. Impressive!

At this rate, top out should be sometime near the end of this year.

Quote:

Originally Posted by KWillChicago (Post 8144899)
Great set! Timeline guess when this will pass the roof of OMPW? Mid June-ish?

Assuming we need about 25 more floors to get to the roof height of OMPW, my guess would be probably closer to mid August.

Freefall Apr 7, 2018 3:07 AM

There should be some fun Lollapalooza shots with OGP and Essex going up

left of center Apr 7, 2018 3:17 AM

^ One of my favorite perks of attending :)

BVictor1 Apr 7, 2018 3:26 AM

Quote:

Originally Posted by left of center (Post 8145557)
3 floors added between 3/7 to 3/23, that works out to around a floor every 5 days. Impressive!

At this rate, top out should be sometime near the end of this year.



Assuming we need about 25 more floors to get to the roof height of OMPW, my guess would be probably closer to mid August.


And remember, with each setback, the pace will pick up because of smaller floorplates.

harryc Apr 7, 2018 3:48 AM

Quote:

Originally Posted by BVictor1 (Post 8145904)
And remember, with each setback, the pace will pick up because of smaller floorplates.

not exactly - the main constraint is the time it takes for the concrete to cure. A bit faster, but not much.

Mr Downtown Apr 7, 2018 2:19 PM

I think it's extremely rare to have less than a five-day-per-floor cycle.


All times are GMT. The time now is 12:09 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.