Quote:
|
About the interim resurfacing - I'm not sure whether it's good or bad. $45.1 million is about the same as the recent Edens resurfacing, both in total cost and in cost per mile. Fixing potholes is nice, but the cost to society in terms of additional congestion might vastly exceed the benefits of the project, especially if it is followed by a more total rebuild soon after. Then again, it seems that the more costly rebuild project will only start west of Central, whereas the cheaper resurfacing will cover the entire highway, including the parts within city limits... so the two projects would be complementary, not redundant.
Quote:
Through Forest Park and Oak Park, I'm assuming IDOT plans to take over some railroad land, either from CTA or CSX. CTA reserved space for express tracks back in the 50s, but has never used it. CSX owns the freight tracks (known as the Altenheim Subdivision) but virtually nobody uses them now that Canadian National has shifted their trains to the EJ&E in the outer suburbs. Without too much costly construction, the freight line could be turned into a set of express and possibly HOT lanes between Central and Des Plaines. Really, all you'd have to do is rip up the rails and ties, level the gravel, and pour concrete over the top, as well as installing ramps at both ends. I guarantee you that any demolition that takes place will be a few isolated parcels, and on the small scale that's being discussed, any historic structures can be re-located. The apartment blocks in Oak Park (which I assume are what you have in mind) are in no danger. |
I think your are on the money ardecila. The CSX rail is suddenly in play now that CN is moving their freight to the EJE. In fact the CREATE planners have cancelled all of the improvements scheduled for this track length section under the original CREATE plan. HOV lanes would be perfecvt for that stretch of road.
|
In the past, Chicago successfully fought off the feds trying to ram HOV lanes down our collective throats (particularly for the Kennedy reconstruction and a lesser extent the Stevenson reconstruction, but I assume the question came up for every other highway project as well), with the argument that it doesn't make sense to subsidize the cannibalization parallel rail transit service.
That said, I'd be fine if the added lanes are HOT lanes so they generate some revenue. |
Quote:
|
Quote:
http://farm4.static.flickr.com/3109/...6a1fb6c429.jpg From "Men In Black" on flickr. I know the expansion needs to be done; Austin to Manheim is such a bottle neck, but places like this are simply irreplaceable. |
It generally seems doable without wanton acquisition assuming all parties (IDOT, USDOT, etc.) agree to exceptions to design standards through Oak Park. The one area of concern that I have trouble envisioning is right at Oak Park Avenue, where it's tricky to visualize how two lanes could be added without property acquisition on at least one side of the ROW, unless, again, the design standards are relaxed such that the expressway has no shoulders for a short stretch. Even with such design exceptions to save buildings, I'm not sure of the impact on ramp geometry for the interchange at Harlem 1/2 mile to the west - I assume the project would also seek to do anything possible to eliminate the left side ramps.
Quote:
Anyone else notice how multiple agencies are conducting multiple planning studies in the same corridor? Whose project "wins" when it comes time for funding? |
Quote:
I really hope demolitions in Oak Park can be kept to a minimum. I don't want to see one more inch of that community raped further by that open scar known as the Ike. I am not warm to the idea of possibility using the CSX right of way either, as this will shrink or eliminate a option for moving trains through our region, and freight traffic is still expected to grow significantly. We might really need those tracks in the future. |
Quote:
|
Someone posting on Chicagobus.org has seen the new 5000 cars being delivered at the Skokie shops - hopefully we'll see them being tested soon!
Quote:
|
Quote:
A major corporation like CSX, on the other hand, owns and must maintain a rail line that they don't use, and now nobody else will pay them to use it, either - CN was the only significant user of the line. It's a far better deal for CSX to just sell the line for cash - I would expect a major corporation to make rational decisions like this, unlike homeowners and small businesses who have emotional connections to their property. It's great in the long run - IDOT doesn't have to pay to reconstruct the complex rail bridge over the expressway just east of Des Plaines, and the rail line north of the Ike can be turned into a great trail linking Franklin Park and Oak Park/Forest Park. Trust me, if there is an avenue by which IDOT can gain additional land without taking homes and businesses, they will make that choice. |
Quote:
|
Quote:
http://www.popularmechanics.com/tech...n/4257814.html |
|
Quote:
Reminder.... Circle Line Alternatives Analysis Study - Screen 2 Analysis Screen 3 Open House Presentations The Chicago Transit Authority invites the public to open houses on preliminary Screen 3 findings and recommendation of a locally preferred alternative, which will conclude the Alternatives Analysis study for the Circle Line. Previously in Screen 1 and Screen 2 of the Alternatives Analysis study, CTA presented an assessment of transit improvement options which included a selection of transit vehicle types and potential corridors for a Circle Line. The Screen 3 public open houses are scheduled as follows: UIC Molecular Biology Research Building 900 S. Ashland Avenue Tuesday, September 29, 2009 6:00 p.m. – 8:00 p.m. Bucktown/Wicker Park Public Library 1701 N. Milwaukee Avenue Wednesday, September 30, 2009 6:00 p.m. – 8:00 p.m. Benito Juarez Community Academy 2150 S. Laflin Street Thursday, October 1, 2009 6:00 p.m. – 8:00 p.m. Presentation will begin at 6:15pm. All venues are accessible to people with disabilities. ------------------------------- I will be going to the meeting tonight and will report back the additional info. |
Display boards for "Screen 3" of the Circle Line "Alternatives Analysis" are posted, with a "Locally Preferred Alternative":
http://www.transitchicago.com/assets...lay_Boards.pdf |
|
that's going to be phase 2.
http://www.chicago-l.org/plans/image...hasingPlan.jpg no direct linking, copy and paste. |
Quote:
Clearly, Old Orchard Mall is a more logical terminus than Niles North. It might not seems like a big deal, but that extra walk in not very pedestrian friendly conditions isn't good. |