SALT LAKE CITY | South West Temple | 278 FT | 26 FLOORS
Downtown Update - Mixed-Use Tower Planned For West Temple 10/1/2020...Note: This development site has just taken on a very serious developer and proposal. What were historic levels of development in Salt Lake City and CSA have now increased even more dramatically with it having the lowest unemployment in the nation and large numbers of people seeking cleaner and safer metros to move to. Forthcoming announcements are imminent. Quote:
PROPERTY TYPE - PRELIMINARY BREAKDOWN Residential, Retail and Hospitality - Coworking - Mixed-Used, Transit-Oriented Development APARTMENTS 340 RETAIL SPACE 6,200sf OFFICE SPACE 58,000sf 28-PLUS FLOORS ARCHITECT Solomon Cordwell Buenz DEVELOPMENT COST $230M FINANCING Fundamental Partners COMPLETION DATE Late 2023 SUSTAINABILITY Enterprise Green Communities Fitwel Healthy Building Certification https://thedomaincos.com/wp-content/..._cropped-1.png https://thedomaincos.com/wp-content/..._cropped-1.png The Domain Companies are currently finishing up their highly successful 'Exchange Project' across the street from the SLC library. Their plans are to now begin to transition onto this project from the winding down of their 'Exchange Project' Pictured, The Exchange, which is the Domain Companies current project, approaching completion. https://thedomaincos.com/wp-content/...cf_cropped.jpg https://thedomaincos.com/wp-content/...cf_cropped.jpg . |
Not bad.
|
Oops, I noticed the address is incorrect. Should read 400 So. West Temple, not 400 West. Hopefully, the moderator can correct that.
|
Quote:
The AIR URBAN CENTER Quote:
|
Update - Air Urban Center Becomes VOID Corporate Center Quote:
. |
Downtown - VOID Corporate Center Tower Moves Forward Quote:
Isaac Riddle Reports : For details on this project please visit SLCityNews @ http://www.slcitynews.com/new-render...owntown-tower/ http://i2.wp.com/www.slcitynews.com/...size=777%2C437 Street-level rendering of The VOID Corporate Center. Image courtesy Salt Lake City records. . |
:hug::hug::hug:Nous Sommes Parisiens :hug::hug::hug: . |
Upcoming and Under Construction Towers. The VOID Center is at the upper right [IMG]https://farm6.staticflickr.com/5750/...82aac59a_b.jpgSLC 1 by brandinof, on Flickr[/IMG] By Orlando . |
Upcoming and Under Construction Towers. The VOID Center is at the upper left [IMG]https://farm1.staticflickr.com/650/2...11366662_b.jpgSLC 2 by brandinof, on Flickr[/IMG] By Orlando |
Bump
|
This project has changed several times. There are rumors that they are looking into a significant height increase but nothing official yet.
|
New owners, new design
Some new details and renderings have emerged! Could we get a moderator to update the name and details of this project? The address of the project is (see below) 370 S. West Temple and it will be 28 stories and likely 400+ feet.
Quote:
|
Hey Atlas, I will get to updating my first post today. Thanks as always for your much appreciated help. LOL, I hadn't visited this site for a while, and can't believe how much transformation this plot has undergone. Good to see that some major developers with a proven local portfolio are now involved in sheparding this development forward.
|
So I stumbled across this page which is dated September 20, 2020 (not sure how we missed it). I believe this is a rendering of the most recent known 370 South West Temple proposal. I have to say that it's a little architecturally underwhelming compared to what I was expecting but it's better than an empty lot!
https://thedomaincos.com/wp-content/...min-scaled.jpg |
I'm not sure how I keep finding new (old) renderings of the 370 South West Temple project. Here's an uncropped version of a rendering we've already seen that I just came across. Project is still in progress, as far as we know. No site activity or announcements yet.
https://i.imgur.com/tr4jX8vh.png Source Remove the "h" before ".jpg" for full size |
New article today in the Salt Lake Tribune:
Look what’s coming to downtown Salt Lake City: another skyscraper. Here are the high points. Quote:
New renderings: https://i.imgur.com/NJ8Ct0Kh.jpg https://i.imgur.com/cBpmLyyh.jpg https://i.imgur.com/aDImd59h.jpg Remove the "h" before ".jpg" for the really big versions. |
Looks like it's 26 floors if you count the mechanical floor at the top. This is also the first official number we have for the height: 277.8 ft. Nice, big commercial spaces on the ground floor!
Quote:
|
This one is still alive! They just submitted new documents under a "Subdivision and Condominium - Final Plat Approval" entry that include some new cross sections of the two towers. The taller, residential tower has gained three floors (28 stories) and will be ~313 ft tall at the top of the mechanical level:
https://i.imgur.com/5vCgogu.png https://i.imgur.com/2s0qQVq.png https://i.imgur.com/CjXakh2.png |
SCB made a design review submission for 370 S West Temple yesterday. It looks like this is only for the hotel portion. The taller, residential portion of the project is called "390 S West Temple." I'm thinking that 390 might not need a design review since it's on a D-1 corner.
New renderings: https://i.imgur.com/RYwyTEhh.png https://i.imgur.com/pYPMvwnh.png https://i.imgur.com/4I1SyUFh.png |
It's great to see growth in SLC, but this building is pretty lame.
|
All times are GMT. The time now is 4:02 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.